Wichita City Council Workshop October 22, 2024
No description available.
good morning staff thank you very much
for joining us in the chambers instead of the boardroom this will now be a change for
Workshop so that uh it is much more convenient for everyone um to do it here rather
than in the boardroom so I will call this meeting to order and and I would like to
please ask everyone to stand for the Pledge of Allegiance thank you all Madame clerk can you
please call the first item approve the minutes of the regular meeting dated October 15 2024 excuse
me excuse me mayor you may want to acknowledge that council member Tuttle is participating
remotely thank you city manager Bob council member Becky Tuttle is joining us virtually today
and we acknowledge her Presence at this meeting thank you I'm I'm sorry I can't be there I'm
at the National Aviation the national business AV Aviation association with staff and other
Community Partners representing the city thank you very much for representing us council member
Tuttle Madame clerk can you please call the first item approve the minutes of the regular meeting
October 15 2024 are there any changes or corrections I see none I move to approve the
minutes of the regular meeting of October 15th 2024 second motion and a second any further
discussion I see none Madame clerk please open the role motion passes can we ask council member
tutle yay sorry thought I was off mute motion passes 70 Madame clerk please call the
next item consent agenda items 1 through 14 are there any items to be pulled council member
Johnson thanks mayor I like to pull item number 11 are there any other items to be pulled I will pull items number 4B 7 and 13 mayor i' like to pull item number 14 please thank you was it 4 B7 4B 7 14 11 13 and 14 I motion to approve the consent agenda
without 4B 7 13 sorry 11 13 and 14 second Motion in a second any further discussion
I see none Madame clerk please open the rooll council thank you very much motion passes 70 we'll start with 4B in numerical
order this is the delayo pathway good morning Gary Jansen Public Works director
yes uh first question is regarding the delayo pathway can you please talk about how much is
the total uh amount for this project and how is it being funded and when will construction end
for this project uh sure mayor council members total project cost is around $2.8 million as
funded by General obligation bonds from the CIP construction is substantially complete
at this time we're installing a pedestrian signal at senut that's expected to be installed
hopefully by the end of the month there some Landscaping is currently on hold uh as a result
of the drought some of the public art component uh as part of the project is expected to be
installed by mid November uh so maybe except for some of the Landscaping portions we would
expect everything to be complete by the end of November and this is also the pathway that will
have a dog park can you explain uh the changes in this work order so uh within this change order
itself The Mink uh change is the natural grass area within the dog park will be converted to
artificial turf uh due to some drainage issues we're also changing the burm height would be be
reduced for ease of future uh care and maintenance this is the only Dog Park area on this project
do you foresee any further change orders for this project not at this time I think with where
we're at on on construction I you never know what happens on projects but right now I don't think
we'd expect any additional costs council member Johnson thank you very much Gary that's all I had for for item number 4B the next one is
item number seven this is child care licensing Gary again yes ma'am uh can you talk
about this change uh how this complies with kdhe and what type of um I guess staff coordination
this requires for this to now become a change in our or our own ordinance uh this item is
for straightforward to align with a change that kdhe made um as far as licensing of child
care providers so we're moving everything into one category we currently have uh two categories
including licensed daycare Home Group licensed daycare home all of that is moving into uh what is
now called a family child care home classification which will align with and match what kdhe has so I
think it'll probably clean things up what it does too is it allows um all Prov ERS then that they
could go up to including 12 U from what they had as 10 as far as their license capacity so uh what
this does and part of the item today is is an $1 a year increase for approximately 246 uh facilities
that had previously been the licensed daycare home so uh the fees for all of these will be the same
as what had been the group license daycare again I know that starts to create a little bit of
confusion all rolled into family childcare home classification I don't think from a a staffing
perspective necessarily that this changes a lot for us um because we're still following the same
guidelines through kdh working closely with them so I do have staff here if you've got any other
questions that that they can help answer just wanted to make sure that the uh providers who are
currently the licensed um daycare homes will be notified of the $1 increase correct they will be
vice mayor Ballard thank you mayor I just wanted to say um council member Tuttle if you can hear
me um I appreciate um all of her work on this and Gary for yours as well along with um staff um I
had no idea before I was on Council how big of a deal um and lack of child uh care we have within
the city and so I appreciate um all the work that you guys have all done on this I appreciate that
too uh I would tell you Adrien lad and her staff do a tremendous job with this I just stand up here
and say what they tell me to say so thank you for that and thank you vice mayor
thank you Gary item number 11 thanks mayor due to a personal conflict
of interest I'll be abstaining from this item item number 13 regarding housing vouchers good morning mayor city council good morning
Sally um my questions really are about this family self-sufficiency program um these are positions
that currently exist but need to reapply can you explain that process and what this program does
sure the family self-sufficiency program is a program within the Housing section 8 housing
Choice voucher program and since 1992 HUD has had this family self-sufficiency program as an
option for participants um who want uh to have a case worker assist with Workforce Development
education uh financial literacy all in the effort to try and improve people's Financial condition
and make them self-sufficient uh up until 2022 we had to apply annually for the funding from
HUD for those coordinator positions the funding can only be used to pay their salaries benefits
and training um but and starting in in 2022 it is a biannual application so this is just the
request to continue the funding so we can keep those three coordinators working with the program
Sally this program is voluntary um can you talk about some of the success rates sure um it is
voluntary uh the program uh requires interested participants to sign a five-year contract um and
work indiv ually to determine their individual goals and while uh under that contract if there's
increases in their earned income they can actually earn escrow uh because of that earned in income
the we've had uh we currently have 93 households that are participating HUD says we cannot um
Force any household to participate so it is entirely voluntary we have to run the program
though in order to be considered for additional voucher allocations in the future and um we've
had a total of 360 households graduate from the program and 69 of them becoming homeowners
because of it and currently how many folks are in housing Choice Voucher Program sure we have
3,100 the number off the top of my head 3,44 I believe is the number currently and over 99,900
on the waiting list for the program do you know from that 3,144 households how many are part
of this program 93 currently 93 of the 3,144 yes and this is simply to uh reapply for the three
individuals who are part of that program correct they are the case workers who work day in with
the clients participating I just wanted to let you highlight this really great program I know
that this is voluntary for the 93 individuals um as part of the 3,000 who get this voucher um
and I just wanted to say that I really appreciate this program um what it says in our handout
uh really um motivated me to pull this item so that you could share the good work um it says
to help increase earned income enhance financial literacy reduce or eliminate the need for public
assistance and move toward economic independence and self-sufficiency so I just want to uh
really say thank you to the three coordinators and I will very gladly uh support this item
so that you can get further funding thank you thank you Sally item number 14 good morning mayor and Council assistant
director Jean zman Jesse Roma is also at NBAA okay I I have a question I did I did email Jesse
uh he did respond um the concern I have is it rate escalation is not at at inflation rate it's only
1 and half% actually slightly below 1 and a half% a year for for 10 years he did point out that the
uh rate there was a market analysis done by Martin company indicate the rate for this would building
would be 950 a square foot we're starting out at 1073 a square foot so kind of above that that's
why the reason for the Lesser rate increase less percentage increase um which is fine then you you
have basically you have a 27% increase over over 10 years um which is slightly less than 3% but
with the time value of money you're probably right there um I would like to request that staff if you
could please if something like this comes up that is less than rate of inflation for increases on
rent if you could please give us a documentation a justification for that in this case it would be
the appraisal from the Martins company I want to make one clarification the appraisal from the
Martins company was done on a facility at 1935 Midfield Road and so that was a single tenant
facility and they gave us a range based on the length of the lease um with the escalation in
one and a half since this particular facility is actually three Suites separated by chain link
as opposed to individual facilities that's why we felt like it it married with the recommendation
from that so that's the same building you started out at 950 a square foot no the the appraisal
done by Martins was on 1935 Midfield which is a different facility than this facility this
is part of the multi-use uh cargo building where several of the cargo tenants operate out of
the same building and then this particular Suite is shared among the tenants in that Suite just
separated by chain link okay is a similar building or not no really no never was an appraisal done
on this building no or any any opinion or anything no I think it'd be wise to get that good okay
especially when we're seeing 1 half% increase rate increases a year 10 years right and and
like I said we we felt that the market for this probably doesn't go with the rest of the market
just because it is that it's like having a shared room with others where you don't have your own
walls or anything so we felt like that justified having a little lower escalation since we were
able to establish a rate higher than the other other facilities in that building is a triple
net lease I'm sorry is it a triple net lease um because it's a multi-tenant building the landlord
does have responsibility for structural roof hva that type of thing electricity uh no they would
pay their own electricity how do you pay your own electricity with a chain link between the
walls um that Suite has its own meter and then the square footage in each of the chain link areas
is allocated based on square foot okay okay okay all right but thank you I would I would appreciate
understand more information do that than what we got there because it just didn't make sense yeah
so okay thank you you're welcome I will I I will know airport leases are a little more complex
because we have FAA requirements regarding Equity or uh among tenants and uh and our lease
rates have to be consistent with schedules that are adopted so much easier for of our other
real estate transactions but it gets a little more complex when we start looking at other
tenants at the airport and what we're charging and that's small tenants as well as uh textr Ron
and others that are out there so but we'll we'll provide more information okay thank you thank you
we will um I will move to approve consent agenda item 4B second motion and a second any further
discussion I see none Madame clerk please open the RO yay motion passes 70 I move to approve
consent agenda item number seven second motion and a second any further discussion I
see none Madame clerk please open the rooll yay motion passes 70 I move to approve
consent agenda item number 11 second motion and a second any further discussion
I see none Madame clerk please open the rooll yay motion passes 60 with one exstension
I move to approved consent agenda item number 13 second motion and second any further
discussion I see none Madame clerk please open the rooll yay motion passes 70
I move to approve consent agenda item number 14 second motion and a second any
further discussion I see none Madame clerk please open the rooll Y motion passes 70
Madame clerk please call the next item Board of bids and contracts dated October 21st 2024 I wasn't sure if I was in the right
order for a second good morning Josh laber Department of Finance the board of bids
and contracts convened October 21st for the following items we have for engineering the
downtown streets two-way conversion pavement markings and signage for traffic control
services incorporated in the amount of 1,483 subject to approval of a new engineers's
estimate and budget authorization we have the water distribution system sanitary
sewer to serve cranor addition for mola excavation Incorporated for
an aggregate bid total of 1,485 $164 we have the storm water
sewer project number 801 one CIP storm water sewer repair for instaform
Technologies USA LLC in the amount of 71,7 we have the storm water sewer number 786 project storm water sewer repair for
Apex Excavating LLC in the amount of 9,855 and for purchasing we have the valves
angle ball valves and brass curb ball valves for the tap of Kansas Incorporated for
an estimated annual usage of $90,100 for a contract term of one year with two oneyear
options we have the roof replacement for the sludge dryer facility at plant 2 for farha Roofing
LLC in the amount of 95,5 78 we have the furnish and install of new furniture for Westlink
library for contract Furnishing rents LLC DBA pure workplace solutions for an aggregate bid
total of $412,400 we have two remote surveillance trailers for our uh realtime information center
for WPD for vision detection systems for 77,4 666 we have the employee learning management
system software renewal for our human resources for skill soft LLC DBA skill soft for an
aggregate three-year total of $67,500 and we have transcription Services recommending awarding the
city clerk's office the ability to use existing vendor contract 242 0022 with our witw Police
Department this is how to become a vendor with the city these are open public opportunities out on
the street today and I'd be happy to try to answer your questions and I recommend your approval I
have one question on slide 8 you had the roofing yeah are there certain there there's not very
many roofers that bid on that are there certain requirements that roofing companies have to meet
to be able to bid or yeah that's a great question um councilman Johnston um it really depends on
each project uh departments will provide us the specifications on this one specifically um I don't
know of anything uniquely um but I can get you the information of who was notified um we actually
have our vendor registration who can complete the goods and services that we solicit and we'll
notify them and based upon that it's just hard telling what what the market will do okay thank
you I was just surprised there are so many roofing companies that why wouldn't more of them bid on
it so I think part of it is a policy discussion or strategic discussion we know um Within purchasing
that it can be difficult for vendors to go through a procurement process sometimes they may not want
to engage in a formal procurement process versus informal I think there's different considerations
but I do I appreciate your question it's a great question okay thank you Josh I have a follow-up
question to just your very topic um the very last slide shows all the open bids uh that the city
currently has um I know you guys moved to a new system how has that worked out so far thank you
fantastic um we're actually at the very end stages of migration to our new bonfire system um we're
really excited about it because it offers more um edbe opportunities for small Contra subcontractors
um it facilitates opportunities to allow a small subcontractor for example um contract manager at
risk chy Dam repairs if if a subcontractor did a very specific finite piece and they said said I
can do concrete and I'm a registered dbe they can actually put on the bonfire public procurement
portal um I am a dbe registered uh that can do concrete and anyone in the public that is viewing
that opportunity can see those and engage with those independently of the city so really excited
about that um the bonfire network is actually larger um because if you have other agencies like
Kansas City Missouri um I think trying to remember Kansas City Missouri and the top of my head uses
bonfire anyone who registers within the city's bonfire portal is also um given the opportunity
to use uh procurement opportunities from other agencies so it's kind of a compounding effect
of amplifying that opportunity um we are seeing larger amounts of interest and larger amounts of
vendors being notified through the bonfire system we're really excited about but overall our staff
are are just very um grateful for the support and the ability to use this software now and it's
much more easier for our vendors to interact with our systems thank you for that Outreach I
know that I was um approached by some U minority business owners and small uh business owners
that were interested in bidding but they didn't really understand the process um so can you just
again one more time I think it's the slide right before uh remind people how they can become sure
great question so anytime um I have to put it out that if anyone wants to meet or if anyone wants
to learn our systems please contact us um at our phone number and email um we're happy to sit
down we have a gentleman who oversees our small business program our edbe program um and he's
routinely meeting with vendors um I think one of our assistant city managers saw him at a coffee
shop with a vendor he is proactively outreaching and having those conversations with vendors if
you're interested in doing business with this city go to our website wi.gov purchasing um you'll see
our homepage and you'll see our procurement portal embedded in that where you can submit and uh view
opportunities with the city um we just recently upgraded our website to have what's called an RSS
feed so if you go to wi.gov purchasing you'll see at the bottom embedded from our portal without
having to click all these public opportunities that we're really excited about so we're
trying to be efficient and effective in how we're demonstrating that marketing opportunity um
but again please contact the purchasing Division if you want help if you want someone to sit down
with you if it's something where we just explain how to do business we're more than happy to
do that thank you very much Josh I see no further questions so I will move to approve
the board of bids and contracts for October 21st 2024 second motion and a second any further
discussion I see none Madame clerk please open the role yay motion passes 70 Madame clerk please
call the next item petitions for public improvements good morning mayor City Council
Members Paul gunsman Public Works and utilities for the record I have a few revised petitions
for your consideration this morning the the signatures on the petitions represent 100% of
the improvement district and the petitions are valid per Kansas statute Brookfield South
Edition located in District 2 on October 11th 2022 the city council approved water
Improvement required for a new residential development the developer has submitted
revised petitions with revised budgets to reflect current market conditions and to
cover the cost of the private bid and I had a typo on this slide both of these should be
water improvements one for phase six and one for phase seven Brookfield addition located in
District 2 on October 6th 2020 the city council approved water and Paving improvements required
for a new residential development the developer has submitted revised petitions and revised
budgets to reflect current market conditions and Pineway addition located in District 5
on June 4th 2024 the city council approved sewer improvements required for a new
residential development the developer has submitted a revised petition with a revised
budget to reflect the current market conditions and with that it is recommended that city council
approve the revised petitions and budgets adopt the amending resolutions and authorize the
necessary signatures and I will stand for questions thank you Paul first question comes
from vice mayor Ballard thank you mayor um Paul could you go back one slide oh two y this one
um I don't think I've noticed that the adjusted budget so much before or do you do you know why
I had that same question and I had reached out um the uh I mean I'm okay with it that's just right
no it is a lot um the uh agent for the developer as well as the developer had increased uh had
elected to increase the petition because they thought dewatering um in order to install the
sanitary sewer was uh going to cost much more than they originally thought so that's why they
increased the petition amount okay thank you council member hoisel thank you mayor
um just checking Paul these are all paid with specials right yes okay just Che thank you I see no further questions
for staff thank you Paul I will move to approve the petitions for
public Improvement second motion and a second any further discussion I
see none Madame clerk please open the role yeah a motion passes 70
Madame clerk please call the next item approval to exceed the gift limit
established by the ethics ordinance for mayor woo to accept travel and expenses
to attend the Rodell Fellowship seminar in Santa Monica November 21st through 24th for the
purpose of representing the city the fellowship is hosted by the nonprofit Rodell Institute
for the purpose of Education collaboration and professional development the estimated
gift amount for travel hotel and meals is $3,249 I will add uh that there will be no
taxpayer dollars spent on this uh this was an honor uh to be selected to be part of the
class of 2025 Rodell fellows again uh this is a sponsored event by a nonprofit that is
a nonpartisan and Center for leadership and intellectual growth Rodell helps America's most
promising leaders reach their full potential as public servants deepen their commitment
to democracy and the rule of law and work together to address some of our nation's
most important domestic and international challenges and again I am honored to represent
Witchita and Kansas through the Rodell Fellowship make a motion to approve uh mayor's
L's travel as presented second motion and a second any further discussion I
see none Madame clerk please open the role yay motion passes 60 with
one abstention Madame clerk please call the next item council
member appointments and comments are there any appointments by council members
I have one I would like to appoint Floyd Ray Bess also known as Bubba to the police
and fire Retirement Board he's a retired fireman second okay Motion in a second any further discussion I see none Madam
clerk please open the role yay motion passes 70 council member comments council member Johnson thanks mayor
um I would like to have a council discussion about moving workshops to the chambers uh
historically we've done that in the boardroom and many in the public feel it's less formal
and a little more inviting than coming into the formal Chambers uh for a workshop and while
I respect one person's view I think that's more of a council decision during covid we chose as a
council to move workshops to the chambers because it was safer but it was a council decision it
wasn't just one of us or city staff so I'd be I'd love to have that conversation as a body I'm
in favor of keeping workshops in the uh boardroom personally council member Glascock I support the
move moving Council workshops of the chamber I feel being in here elevates the work that we
do to the public I feel that we take the work more seriously when it's this room opposed to
the boardroom um I also believe that uh from the voting perspective it's more transparent
to the public to have it on a screen I think the presentations are more comprehensive and I
just feel there's a weight and gravitas of being in this room opposed to something else especially
when we talk about cinogen items and if we believe that Consin items carry the full weight of any
other items in the agenda and we pull them off I believe voting in this room matters more um
also has more space for individuals if people want to join but I'm supportive and I also believe
that the mayor is um she runs the meetings I think it's her directive of how the meetings are run
as well and so I'm supportive of it being in the chambers I'm easy I can go either way I'll just chime in I think I would like to have
more of a discussion if that's possible I mean I think there's pros and cons of either way I
appreciate the comments from all of the council members council member Johnson and council member
Glascock but um I I do think that it warrants a discussion and input from the body thank you
we can continue discussing it right here from the bench council member hoisel thank you mayor
um council member Johnson could you elaborate a little a little more on the decisions to bring
it into the boardroom what was the thinking of council at that time into the chambers at from Co
because we were in The Boardroom prior to that the um workshop's always been in the boardroom that I
know of even back in like the early 201s whatever when I used to come to meetings it was always
in the boardroom um it was also pretty cool being a member of the public because you were much
closer to the city council they were all sitting in front of you can sit in those chairs and you
really felt more engaged with the conversation rather than Council meetings being out there in
the chambers now during covid because we had to have those barriers up and we wanted to make
sure we were not only being good examples to the public but also being safe we were in here
because we had those dividers and we chose to come in here and we didn't have every member up
here we had two members down there as well um for safety but right after Co we all wanted
to get back to the boardroom because of um workshops were just different it's still formal
but not as suit and tie formal it's not as uh I guess formal was being in the chambers and the
workshop is always Council discussion anyway and even these items that we're going to talk about
today we receive updates from staff we talk about direction we may want to give staff and again
public just felt closer in that sense so for me um I appreciate that tradition I think there's a lot
of benefit to being in the boardroom as as opposed to the chambers there's a difference between our
meetings and our workshops we're not voting during a workshop um the consent meeting right before
that uh historically had only been like 5 to 10 minutes so workshops in there made sense um I'm
consent meetings now are a little bit longer but I still think that the workshop is better off
in the boardroom but again personal preference appreciate that uh Bob um have have they always
been in the board board room since you've been here okay yeah um sitting in the boardroom
people have a easier sight on my bald spot back here so that's one drawback of the
boardroom anyways thank you guys as I'll try to summarize a bit of what I'm hearing
um I've been going around uh this community trying to be much more transparent and inviting
to people to come to Council meetings and one um consideration is people don't really know um
when Council meetings were so we made Council Workshops the exact same time as Council
meetings on the first second and third uh Tuesdays of the month so that was one change
that happened this year so now you know that every Tuesday at 9:00 a.m. there's either either
a regular council meeting or a workshop meeting in addition the second point is we do vote we
vote on a consent agenda not only on the consent agenda but a board of bids we also uh talk about
um the improvements so we do vote um so there is a formality to it and it is back to transparency uh
community members should know that we do vote on these matters and we now are much more intentional
about pulling items so that Community knows that we're not just uh voting on one packet of consent
agenda items but each one has its own weight and as you saw today um there were multiple items
that were pulled um that would not have gotten that attention uh had we not pulled it uh
so in summary from my perspective is this is also taking into consideration staff and I've had
conversations with staff asking um is this easier um and much more conducive to communicating with
the rest of the public uh in this forum or in the boardroom and I was told um from Communications
that this was easier um and again back to being conducive to helping uh communicate better uh
so I made that change yesterday asking staff um but I will gladly continue this conversation um
as you know because we have a open meetings act we have open conversations in these forums so that
everyone can understand um our thought process and so I will gladly continue this conversation vice
mayor Ballard thank you mayor I think just out of consideration for the other council members
it would have been nice if we just had a heads up maybe in some of our weekly meetings that
this is something that um was of interest to you just so we didn't get an email saying what
the change was prior to us having any type of Engagement council member Johnson thanks mayor um
I think two points i' I've known for a while from Co that it is easier for comms to run the meeting
on here because it is the chambers it's set up all the cameras are up there the boardroom has it as
well and the difference is that there just has to be an additional setup by the building crew um
aside from that I don't think this room is more transparent than the boardroom because we still
talk about what's in the packet transparency is the same the difference is there's just those two
screens instead of the one um and then the vote total comes up on the consent meeting but each of
us have pulled consent items from the boardroom we've discussed them staff has presented on those
uh and if you watch the Youtube feed people still get to see who's speaking they still get to hear
the questions and information so I don't think this uh hurts nor improves transparency um but
I do believe the boardroom is more welcoming to people um who want to hear our discussion and
can sit closer to us um and engage with us in that way this is Becky and I just want to chime
in I'm sorry again for being remote and it's probably a little echoey but um council member
Johnson I was making some notes and you took a lot of my thoughts so I don't know how you can
get my notes even when I'm in Vegas but I do not think that formality or transpar transparency is
compromised in the boardroom and I've actually had community members say they appreciate it being in
the boardroom um as a community member I presented one time on workshop and I would have been not as
comfortable in Chambers as I was in the boardroom so I I appreciate the discussion I'd like the
opportunity for more discussion thank you council member Glock thank you I'm glad we're having
more discussion From the Bench about this as well I pulled up the duties of the mayor as well
section 20430 duties of the officers of the mayor and Council um it says that the mayor um Authority
is restricted to that of a council member except while serving as the chairman of the council
meetings but the mayor should have the ability to make this decision though I am am supportive
of it regardless and in in addition I would like to see workshops consent agenda items have um
opportunity for public comment there are very few opportunities that we all meet as a body and that
the public can address us all seven at one time and I believe that we should add to the workshop
and consent agenda items on the fourth Tuesday of every month an opportunity for the public to
speak in public comment like we do at every other council member Johnson thanks mayor um I'll pull
that ordinance up but I believe the mayor is only the chair of the meeting during an official
meeting and this decision was made outside of an official meeting I also would uh I disagree
with having public comment during the workshop the workshop is often for Council to discuss uh
an item that is coming before us where we would like to see it go and when it comes to public
interaction it is the workshop that we tend to say let's go out for more public comment and asked
staff to uh work on setting up presentations at the various District advisory boards or call for
public meetings in that space uh at the workshop I think that should continue to be Council
discussion amongst us uh and our team and then also to go back out to the public we can give
that direction there sometimes we receive things in workshops that are not um completely done
fully thought out ideas directions and then staff will go do a lot of work to get some of those
thoughts complete and then those will go out for presentation to the public I think that process
should continue as it has been council member Glascock thank you mayor thank you councilman
Johnson I should have probably clarified public comment at the beginning as we do with the 25
minutes not about specific agenda items but public comments at the beginning as we do with any
other meeting um I had three board appointments reach out to me about this meeting in particular
I wanted to come speak about Animal Control issues because that's been in the news and because this
meeting doesn't have the ability for public Comon to say something from the start we don't have a
meeting on the fth Tuesday the next time that they can speak before this body is November 5th and I
feel that is a long period for the public not to address this body given the opportunity that we
are all still meeting here I don't think adding 30 minutes at the addition to hear public comment
is overburdensome for this body in particular I think our past two meetings we've had zero public
comment or maybe one uh person that had signed up in advance people had me prior so I was talking
about prior not about agenda or Workshop items council member Johnson thanks mayor I don't have
a problem with that I do think that ultimately would be another Council vote though to add public
agenda to the workshop meeting I'm not opposed to that I mean I would agree that that would require
an ordinance change to the order of business because it's an ordinance change can we
do it from public uh from council member comment items right now or does this need to
come before uh November 5th it would need to be directed to pursue and draft a change as
you um direct um could be brought back at a council meeting discussion on new business
council member Glascock thank you mayor um I actually don't see the individuals that
had reached out to me in this meeting um though I thought they were going to attend
however because we can change the agenda as presented because we haven't adjourn could
I make the motion that we open up to public comment before we adjourn to see if there's
anybody public that wants to address the B am I allowed to do that procedurally
well it's not provided for by ordinance um it's your meeting and you can um
make make that decision um I don't believe it's prohibited so I make the
motion to add to the agenda a period of public comment not to exceed 30 minutes as
a reflection of what we do normally during meetings we have a motion can we do that
motion and a second I'll second it uh but there's discussion now council member Johnson my
comments are not the motion vice mayor Ballard so is this just for today or just for today and
then we can vote on an ordinance later yeah sure okay great we have a motion and a second uh any
further discussion I see none I'm sorry could council member Dalton council member Glascock I'm
I'm sorry could you please repeat the motion I'm also good with councilman Dalton that's fine
uh the motion is to add a period of public comment to today's agenda not to exceed the 30
minutes as we typically do on normal meeting days Motion in a second any further discussion
I see none Madame clerk please open the role yay motion passes 70 before we close out
council member comment and begin a public comment are there any further items from the council
council member Johnson thanks mayor I just wanted to read something that was posted online about
the move this person says it's weird to see the workshop in the chambers this is separate business
than General Council meetings also they said this feels Weir weirdly authoritarian the boardroom
makes it an equal playing ground and allows the public to see local government in action council
member Glascock thank you mayor I'm very glad for this discussion I think we should do more of this
from the body so I'm thankful for that um just to counter I think th those arguments are we pulled
consent agendum items off today and so that is the work of this body and so if we have the intention
to continue to hear consent agenda items at Workshop then we should have uh the opportunity to
engage from this bench because it's the official work body if not let's just do a workshop and vote
on consent agenda items and postpone that would be my my change if we have a workshop let's have
a workshop separately but let's not add a cons items because that should be and is the work of
this body in official government capacity From the Bench council member Johnson thanks mayor
um that's difficult because sometimes there are things that require action uh on that
week and that was kind of what the consent agenda piece was for um going forward because
we're just having discussion and I don't know procedurally what that would look like I think
because there's disagreement on where we are I would love to see a future item for the council
to vote where to go whether it's in the chambers or in the boardroom then we can be on the record
and the majority of the council can say either way I'm in favor of that um I will direct staff
to create a new business item for the November 5th meeting so that we can vote on whether
to have workshops in the chamber or in the boardroom I think it's just a Direction St is
that right so I see no further discussion I will add one uh item that is not um related to
this I just want uh for the record um Public Works director Gary Jansen sent me an email um a
followup to a question I asked last week regarding air quality and any opportunity that I have to
highlight what staff has uh sent to us I will um because again that is back to transparency
we ask questions and staff does respond and so I want it to be on record uh the question was asked
regarding um a violation to the air quality uh and what type of penalties the city could face if uh
we violated that and uh in this response uh which came from the senior environmental specialist
for the city of Witchita um it says um a few years ago a very loose estimation of the cost
of nonattainment was done according to Dawn this estimation showed about a cost of $10 million per
year over the 20 to 30e period in accordance with the plan the EPA would put on us to get back
into attainment more recently Oklahoma City has done an estimation of what this would cost
their region since the okas Oklahoma City metro is facing non-attainment quote a recent study
shows that a violation of federal air quality standards and ensuing Federal regulatory
requirements could cost the Oklahoma City Shaunie combined statistical area as much as 9.6
million to 15.2 billion over a 20 to 30e period so again this was a response to a question we as
a body asked if we did not reach attainment and again this was a consent agenda item from
last week and I appreciate that staff uh responded and provided that feedback any further
comments from Council Members I see none I will now uh ask for public comment uh would anyone
from the public like to address the council good morning Twilight Purity I live in District
One Polo Club I've attended both City Council meetings and workshops um the vibe in the
boardroom is a little less formal you guys seem to chat more or it's a little lighter but
as an attend the I'll tell you the boardroom can be crowded um the chairs aren't comfortable
at all I attended um there was a workshop and I think you were talking about pickle ball it was
quite crowded and you were when you're backs to everybody you C you couldn't see the enthusiasm
for people in the audience so there's something I think to be said you guys are very um you're
observant and you see facial comments or facial expressions and can interpret those so you're
missing that and I I don't agree when somebody says that to see local government in action
it's better in the boardroom because we just see the backs of your heads we don't see your
Expressions it just doesn't feel welcoming or engaging I understand that this is the exception
I'm not able to um usually comment at workshops but you you just can't see what's going on or
what people are thinking so I I just wanted to share that as somebody who attends both the other
thing too like in here and I don't know because it's a workshop but we're not able to see the
votes um today and usually you know we can see that you know the time well I can understand I
guess why there's no timer I won't take advantage because there's not a timer but as somebody
who attends both I just want to let you know thanks anyone else from the
public who would like to comment uh Matthew brck uh I just am happy
that you guys uh found this opportunity to have public comment uh for today I'm here with
the Arts Council uh I came to support uh public art and uh I saw that there was some notes in
the minutes about the last 10 years of public art funding and I saw on the list just so many
incredibly cool so incredibly fun just the kind of things that enrich our community uh things
that are vital for the future of our community to continue to keep young folks coming here
and wanting to work and live here um I hope that you guys uh get all of the information
that you need from today's uh world shop with the public art overview I I'll point out that um
I noticed on the consent agenda the item for uh Lily's funding for the trip to California I think
it's great that uh she'll have the opportunity to go there um I just I guess would have liked to
seen more digging into that item as far as like well where did this gift come from and how did
she get these funds and all of those types of things I I think as we're talking transparency
and we're going to make an exception to a gift thing um I think some of the citizens might
want to know like where did this gift come from if it was just the Institute and they give
it to all of the public people that they invite I think that would have been great but otherwise
I love the fact that you're going to allow public comment if you do continue to allow public
comment in uh these meetings because I think Dal made a great point that there could be an
event that's important that you might not then get those for three weeks and uh it's a great
to have the opportunity to speak to this body and support the things that we're passionate
about and for me that's the Arts thanks for your time would anyone else from
the public like to address the council I just want to piggyback on what twiler
said I can I can hear way better in here than I can in there I like the intimacy of the room
but the sound is much better in here and I'm a little challenged in that department so as I
hear you all excuse me I hear all of you really well in here sometimes the speaker is too far
away from the and I it's a I also like seeing the head shakes and the eye rolls and stuff like
that so it adds to the meeting so anyway thank you anyone else from the public would
like to address the council I see none I appreciate the three individuals who
spoke before us um it looks like there is some favor for um the public comment piece
so I don't know if it's a direction for staff also I think there needs to be a motion
to direct staff to prepare an ordinance to change as you wish and if you'd like
mayor we can roll that in with the discuss question that you've already directed us to
bring back I would like that do I have any F in favor I see a motion by council member glas do we
need the motion or probably would be safe give us Direction so we'd bring something back so I make
the motion and I guess this this would be the question for Jennifer too so when we meet today
it's still a regular council meeting and until we break for Workshop correct well yes and no there
is a special um ordinance that talks about the order business for Workshop meeting so okay so
I would uh motion that in the special Workshop ordinance we add public comment uh to the
beginning to reflect what we do during regular business meetings second motion and a second any
further discussion yeah this is cember tutle um I I just we're we're if I'm understanding this
right we are adding one or two more ordinances to the city is that correct my motion is a
to amend the current ordinance not add a new ordinance okay I just wanted to clarify correct
thank you Jennifer did I say everything that needed to in that motion yes you did I mean I it's
to direct staff to bring back the ordinance and and I think the record also reflects the
intent to bring to have staff bring back a change to the location I would also like to
amend that motion um I think you just saw this is the first time ever the council member agenda
shows greater transparency regarding travel by council members and mayor and I want that to
also be reflected in an ordinance or reflected in a I guess on the record um that this shows
number one greater transparency uh showing who is paying for the travel and if taxpayers
will be paying for the travel I think it should also be mentioned um I am not getting
a check for $3,249 this is the organization the nonprofit paying for my travel my hotel
and the meals while I'm there I'm not getting a check for this um in addition to I think
this is moving forward all travel will have this type of verbage so that it is clear for
community on whom is paying for the travel and again for my travel regarding um the Rodell
Institute seminar there are no taxpayer dollars so can there be an amendment to also
how council member agenda travel is noted mayor we can draft an ordinance if that's
the direction you'd like this codified in an ordinance um that motions should be reflective
of that information that's direction we can draft it Council vice mayor Balor thank you mayor
Jennifer so how is that different than what we're doing right now cuz I asked you know a
couple weeks ago when we were started discussing this that I thought it would be great if we could
include this I think the majority or if everybody um agreed so do we need an ordinance or is this
just the direction that we would like for staff to include this or the public I don't want it to
make it too complicated I think what is what was presented today is great um and if any you
know whoever's traveling if they wanted to add additional information that's great
I just don't want to make too much more work for staff because I think it addresses
what my concerns were yeah vice mayor I think that's a good question we are able to do this
under staff Direction um I think the mayor's motion would codify it so it's just a question of
policy when it just directed by staff or what it cified I would like to codify it by ordinance
but I will gladly take any other comments from Council Members council member Johnson thanks
mayor um just a procedure piece here there was a motion in a second for one item and then
you brought up a potential amendment I did not hear friendly Amendment and I did not
hear that accepted so are we voting on the initial amendment by council member glasscock
and then yours or is that a friendly Amendment and council member Glascock accepts I would not
accept not because I don't support the motion but I think it's very different um in terms of
travel versus public agenda and so probably I would like two separate okay so we are back on
council member glasscock's motion correct we'll start with that motion and did it get a second we
have a motion and a second regarding adding public comment to workshops any further discussion
I see none Madame clerk please open the role I motion passes 70 I motion to ask staff to codify
the language regarding travel by council members and mayor second Motion in a second any further
discussion I see none Madame clerk please open the role I motion passes 70 thank you for the robust conversations and now
I will motion to adjourn officially this meeting second Motion in a second any further discussion
I see none Madame clerk please open the rooll I motion passes 70 we will now turn it over to city
manager Bob Leighton for the workshop which will have no official binding action thank you mayor
um we've got uh three items for you today uh two of them are related uh at and they discuss um
future plans for our uh water uh delivery system or treatment and delivery system the first one
is a discussion about the future of the existing water plant and so I'd like staff to present
um the work that has been done to this point assessing the condition and the uh options
for that plant and recommendations from not just staff but a working Advisory Board as
well so with that I'll turn it over to Gary Janson good morning mayor council members I'm
just gonna be very brief here and and introduce this and manager gave you a head start so you
know as we move towards uh bringing our new water treatment plan online sometime next spring
there's going to be a period of time where we'll be operating both plans but it's likely by
early 2026 we'll be uh bringing our current water treatment plant offline um and so we spent
the last 12 months or more evaluating options for for what to do next with that facility um
Laura quick our utilities optimization manager and expert in a lot of other areas has led this
effort for us and so I'm going to turn it over to her and let her walk you through um the the
options that we've looked at we focused on uh it really started to to move towards wanting to
use this facility uh in an emergency situation so you'll see that most of the options she's going
to discuss with you and we discussed with the steering committee uh kind of looked to that but
we also looked at other options too uh what future growth might look like in some of those needs
so I'm going to turn it over to Laura thank you all right thank you I'm Laura quick with the city of wiah uh Public Works and
utilities utilities optimization program um so just a brief agenda for today
um going to be going over each of these things with you a purpose a history um brief summary
of our current water demands um some example condition assessment findings that we have
found um Alternatives that we've looked at and um highle cost estimat associated
with those I have a steering committee and staff recommendation to go over with
you and then we'll talk about some next steps um so to give you some context for why
we're here today um as Gary mentioned the new Wich to Waterworks project is nearing completion
and should be coming online in April of 2025 um from that point both plants are expected
to operate simultaneously for about 8 to 12 months we don't want to take the current plant
offline until we've put the new plant through it P giving it a chance to operate in All Seasons
high demand low demand things like that um so we do need to start talking about what are we
going to do with the current water treatment plant or you'll often heard it refer to as main
water treatment plan mwtp we're going to have to stop calling it that at some point but um these
are the questions that we are trying to answer what function will it serve um what budget do
we need for it to serve that function and what staff resources are we going to need um so really
today this falls into the category of things that you guys mentioned earlier where we don't have a
specific item we're ready to bring you yet we're not ready for a decision um this today is about
are we on the right path or is there a different path that you'd like us to explore um so earlier
this year we contracted with Burns and McDonald to develop options and high level cost estimates
and this presentation today is the result of that work a brief history of the current water
treatment plant um the initial part of the plant was constructed in 1939 so we're now 85 years old
for the oldest parts of the plant was expanded in 1953 U 1992 we had a partial rehab um and then
skip forward to 2011 through 2016 the plants now around at that time was around 75 years old
age was starting to become a parent we um it was clear that trying to maintain it was becoming
more costly so we started looking at options um for rehabilitating the current plant or
replacing it with a new one uh back in 2016 is when we ultimately decided to construct the
new Wich to Waterworks plant after determining that rehab wouldn't be enough to reduce the
overall risk associated with continuing to rely on the old water plant as our water
source for around half a million people um so 2017 to present has taken us through design
um construction expected now to complete April of 2025 and as Gary mentioned should be taking
the um current plant offline probably around 2026 so we wanted to know how much water do we
need and how long will the capacity at our new plant be enough um so we looked at some historical
Trends uh we looked at Trends in both the daily average water use as well as the highest single
day for any given year um what you see on this chart um I know it's kind of hard to read but
the break in the middle is 2024 so that's present so everything to the left of that would be our
historical actual usage um everything to the right would be our future projections um the bottom
line reflects our our um average consumption the top line reflects our uh single highest day for
any given year so then to project that out into the next 20 years this chart goes all the way out
to 2045 um we've made some trend lines based on past data um the trend lines show on this chart
are based on our most recent year so 2023 is a starting point um using 2023 as a starting point
the highest we would expect to see in 2045 for a single highest day would be 86 MGD million gallons
per day um we also looked at this another way uh and used the 20e rolling average as a starting
point that's not shown on this chart but that would get us up to a 96 MGD expectation
in 45 so the takeaway from this um current and projected demands do not indicate a need for
more than 120 MGD which is what the new plant can provide and I have some examples to show you
um some condition assessments that we did um and keep in mind a lot of um our assets at the
current water treatment plant can't be seen um they're underground or submerged at least
they're difficult to show in a picture so the pictures I have here for you um the first one
on the far left is a floculation basin uh you can see a Paddle Wheel showing signs of corrosion
and there's a concrete walkway showing some concrete deterioration picture in the middle
is a secondary sedimentation Basin showing a chain scraper system that's corroding and then the
picture on the right is a lime residual transfer pump showing delaminated paint and corrosion
so just some examples of the kinds of things you'll see at the current water treatment
plant um conclusions from our condition assessment the plant is functional thanks to
the routine maintenance that our staff does on a daily basis but there's also quite a bit
of deferred maintenance that would need to be addressed um examples there concrete condition
valves piping and the roof um another point I didn't have a picture to show of this but
our disinfections chemical storage facilities don't meet current regulations um we're not
curently ly in violation for that because they were constructed according to code at the
time but they wouldn't meet construction codes for safety today um they're aging they pose a
risk to our employees and so the responsible thing to do once we take the plant offline
is to rectify that um third conclusion uh different parts of the plant will be will need to
be rehabilitated to be and maintained depending on which raw water source we use if we are going
to continue to use the plant some function so in other words it's not a complete
throwaway at this point there's still um some beneficial use we could get from
it but we would need to put some um effort into that Laura may I please ask you to speak
closer to the microphone for online audience sure all right so um we looked at uh this says
we looked at seven options we actually looked at a total of eight but we rejected did one pretty
early on I'll come back to that in a minute uh but the things that we looked at between all
of the different options we were specifically paying attention to how or if the plant would
be used for each option uh most of our options focus on using it only as an emergency backup
um we have some variation in what source water we're using uh the treatment capacity uh startup
time is a very important consideration for us so if we are going to use this for an emergency
use how long would it take to bring it back on online um and then we also vary in uh the options
vary in finished water quality and of course they vary in cost so the costs that we're looking at
include construction and ongoing maintenance um for those emergency use options it's going to
include a cost to keep it in standby mode but it's not necessarily going to include
the cost of operating the plant in the event of an emergency um the nature of the
emergency is going to determine the cost of actually operating it in the situations
is it a one week a one month a one year kind of a thing um and the the differences
in operational costs is not going to vary too much from one option to the other with
one exception that I'll get into on a future slide so this is a summary of all of our options
um I did bring this slide printed out I wasn't sure if you guys would have it in front of you
or not but I'm going to go ahead and pass it so what you are passing around is the exact same
thing that the public can see on the screen right now and I'm also going to come back to this a
little bit later uh but I do have a slide for all but one of these options and so I'm
going to um move forward with those the slide that I don't have a um or the option
that I don't have a slide for is actually option number eight um adding capacity and
that's because we stopped uh digging into that one pretty early on after realizing there
wasn't a driving need to add capacity at this point uh and I'll give you a little bit of
a spoiler alert as well um the committee and staff recommendations are uh in order
of preference number five and number four so when we get to those options I'll dig
in just a little bit more deeply on those the first thing we looked at was a complete
site demolition um How much would it cost to remove everything on site um and this is a 15
Acre Site keep in mind a lot of the assets are buried or submerged um most of what's there
you can't actually see there's quite a bit underground um so could we prepare the site to
be used for some other purpose uh analysis on that um would take about a year to complete that
at a capital cost between 50 and $75 million uh the graphic here I realize it's kind of
difficult to see but everything shown in red those are pipeline assets that would
need to be preserved for um we're we're going to continue using those so the um onsite there
are still some assets that would need to be in place if we can go back there real quick
what are the chall that's quite a steeve uh cost right there 50 to 75 million what are
the extenuating circumstances does that drive up that cost I don't have the specifics on how
that cost was arrived at um but like I mentioned it's it's because so much of what's there is
underground um there's just that much to remove and and when we're talking about demolishing
scraping the site getting everything out of there deconstructing everything that's there
um it added up quickly but I I don't have more details than that I can get that for you okay
and we have to remove everything underground um I would assume so if we're going to use it
for some other purpose uh the idea with this particular option was does it hold any value
for us to uh remove everything that's there and potentially use it for something completely
unrelated or for a a private developer or something like that um so the uh idea with this
one was to remove everything yeah thank you did did a contractor come up with that price or that
was our consultant Burns McDonald consult I know when they they built the biom med Center they
found some uh underground had to go down quite a ways to remove it and infill it with sand
I doubt if it was 50 to 75 million okay I'd like more information on that sure and this
is my least favorite option out ofie options prior but even just the land not even so you
have a 50 to 7 million capital investment to be able to remove it there's zero chance
we get any return on that even selling yes we can do a little bit more um work on that area all right so the second option
we looked at was mothballing it and making it safe and basically we would be um
taking it offline indefinitely and including dismantling the chemical storage equipment that
I mentioned earlier that's the make safe parts um we would not do any Rehabilitation unless
there's a future demand to bring it back online um startup time if we were to decide to
bring it back online would be a year uh plus um we'd be looking at making the design and usage
decisions at that point so essentially this is deferring any of those decisions until sometime
in the future um there would be no Provisions made at this time for disinfection or corrosion
control um we'd just be leaving everything as is we would have an ongoing need to M do some
minimal maintenance just to preserve what we have there so it could continue to be used in
the future if needed um the estimate there was that would take two full-time employees um
and that's doing some basic maintenance such as filter backwashing operating the feed systems
um exercising the gates valves pumps and blowers at least month monthly and keeping the electronic
control systems up to date so there's no Capital cost associating with mothballing the plant
until it is returned to service um the 20-year life cycle cost and this accounts for witch to
Waterworks is not functioning we're going to redirect water to the main water treatment plant
these are not options that could add capacity this is using the same Source water going to one plant
or the other um triggers for these emergency use options could be a catastrophic compromise at the
new plant such as a tornado fire or flood um or it could be some sort of planned outage that takes
out um multiple uh treatment trains for example so we have a high degree of redundancy at our
new water treatment plant but if we did need to take multiple assets out of surface at the same
time this could potentially be um a measure to mitigate that can I ask real quick have we do we
have any examples of something like that happen some catastrophe at a water treatment plant that
just picks it offline for a prolonged period of time um yeah actually uh our city manager would
be familiar with the flood 19 1993 in De Moine um that was one that that did take their water plant
offline um the community there lost their running water for 11 days uh you can maybe imagine the
fire danger the disruption to schools hospitals the entire Community um so besides not having
water for 11 days it was actually another eight days before the water plant was producing safe
water so almost three weeks um from a flood which is probably one of the more possible scenarios
for our community when was the last time witw flooded I cannot answer that it's a long long long
time that's just one issue that that plant was subject it was close to the river subject to that
kind of Hazard I think it's other opportunities for wiping out the plant a tornado or some other
significant disaster I don't think you would say flooding would necessarily you know jeopardize
our plant because of the big ditch and and work that's gone into it in that regard um as a
result of their plant going down they have now they have two plants they have built a second
plant for redundancy well there's the human tragedy of you know 11 days without water longer
than that so there's a human tragedy I imagine there's the financial cost of the city as well
did they you may not have that information now and I can look that up myself later but was there
a capital cost as well that cost the city in terms of loss you might know more I don't remember the
capital cost de is very similar to witchta in that it's the regional provider of water so most of
the Suburban communities were also dry I what would be interesting is the cost to the economy
yes because again De Moine is not as reliant on manufacturing as Witchita and loss of water would
basically shut down manufacturing operations for an extended period of time here which has a as we
know has a very significant cost to the private into our economy I would just be and I don't want
it to be a heavy lift because I think we need the redundancy too but if there's the economic cost
of what you know one day without a plant would look like or 10 days without a plant would look
like in case of a tragedy or in case of something I think that would offer more justification for
an emergency use aspect to be able to bring out too obviously there's the human part but there's
also the economic question of what does water not look like in a community 11 days sure I actually
would like a follow-up question to that I want to know what the new water treatment plant and
all the redundancies that are already in place for this new water treatment plant so that
we don't have to have another redundancy to the redundancy Laura can maybe talk about that the
redundancies are system redundancies so if a piece of the plant goes down you have a backup system
for that we spent a lot of time talking about that in the design and final approval of the plant
but we never represented that a cat catastrophic catastrophic event that would take down the plant
that that could be covered under the redundancy so it's really two different scenarios that we're
talking about um and we could obviously give you more information regarding how the redundancies
are built into the existing system but as the as lores listed they're going there's always
that potential for a for a tornado I guess or something to that effect and since we have a
plant now the question was how to go forward it's this is a I think it's a very legitimate
policy discussion to have because there's it's how much risk are you willing to tolerate um
going forward and we had this I think I may have mentioned when we were doing initial planning
for the plant we had um some private sector Representatives that helped us think through all
of this they were a little more tolerant in terms of risk than our elected officials at the time and
I think that was re enforced when we lost a main transmission line and we had we lost water supply
here and our the way our residents responded and concerns they had about losing their source of
water for well how many days were we down on um do you remember three days yeah yeah so I'm you know
you have to judge what the public would tolerate and what our economy would tolerate in terms of
the amount amount of risk you're willing to take and that's so that's judging demo ition all the
way through these other options we have and so it's a cost benefit uh review and some of that
is more at a policy level than it is a business have we evaluated the effect of it F3 Tornado F4
tornado because those walls are yes huge right obviously the administration building would be
gone right but huge tanks it'd be tough for a tornado to move sorry I might jump in real quick
you know I don't know that we've we've so there's there's two buildings on site of the new water
treatment plant that are are generally tornado proof that's a generator building the operations
building but uh there's nothing out there just like any other building in this town that's
going to be completely tornado proof there's so many scenarios of where it happens when it happens
regardless of the size of it I think it's prudent to consider that that it could take out any part
of the facility even with the Redundant systems in place that would take down all operations
of the plant so uh from from our opinion the the risk is real uh I think the the manager said
it really well it's this is probably going to be really a challenge to look at this as a cost
benefit from the economic standpoint there's just so many different scenarios uh but I I don't
think anything is is foolproof or tornado proof even even with those two buildings that were
built that way uh you see Across America what happens at different times and entire communities
are wiped out that's what we're trying to plan for so you have a sense now of how difficult
this um decision-making process is and we've been asking a lot of these questions ourselves
too and it there are two different ways to look at it I mean we've we've never experienced
an emergency of this magnitude for a water treatment system that lasted for uh weeks or or
months but that doesn't necessarily mean it never will so it's really a question of how much risk
do you want to take on um we have an opportunity to mitigate some of that risk of a catastrophe
with this current water treatment plant um it doesn't have to be used in that way uh but it it
does hold some value for mitigating a potential risk um so onto our option three which is our
first um emergency use scenario um and this this would have been the cheapest thing to
do if we just said let's just keep keep the plant there but not worry about treating
any water um we just use it to be able to put uh introduce raw untreated water into the
distribution system if we had a catastrophe at least we could fight fires um at least we could
provide running water even if it wasn't pable at that point um this would potentially give
us up to 50 million gallons per day it would take a day or two to start up um but ultimately
that concept was rejected by kdhe um because of the risk associated with putting untreated water
into the distribution system does that mean we we're not allowed to by kdh pursue this option
or um basically although we did not push back hard at this point um after hearing their
concerns about it we moved on to something we thought would be more palatable but they did
not say we absolutely could not they didn't like the idea they so this one would be going back
and forth with them if we pursue this option that's we could do that we could push back and and
try to pursue this I might add one more comment sorry to butt end so just to provide a little
bit more levity to this we're talking about the idea of putting contaminated water if you
will into this we're going to contaminate the entire system and so there's no way of knowing
the length of time it would take to disinfect the entire system to bring it back online we
we could be out of a water system for months and months if not longer if we introduce water
like this into our system I don't think we want to push back um you'll see again when we look at
the options from a cost perspective it's not all bad I think it makes sense that they said no to
this and I think we should agree with it myself so this is a still emergency situation here
still an emergency situation but it creates such a longer lasting effect on our overall
system and what it does for moving forward I think Flint Michigan showed us the impact of
changing the type of water that you put into a system and the unintended consequences um because
there are certain things we do to minimize the leeching of the of lead and other chemicals into
the water and you lose all of that by putting untreated water in as well there's just a lot of
consequences this is not a good option okay well I appreciate the uh the information any thank you
all right so option number four um this is again for emergency use only um under this scenario we
would be treating groundwater only uh we would be disinfecting it so it would not go through
a um water softening process um one positive to this scenario we would only need to preserve the
portions of the current plant that are required for groundwater disinfection uh we would no
longer treat surface water at this plant so that takes care of a lot of the assets um Capital
costs associated with the include constructing two new cross connect pipelines rehabilitating
a 66in flow control valve demolishing the East primary settling Basin and that is to make
room for construction of a new disinfection building um under this scenario we'd have a
capacity of uh 45 MGD um and I I probably should have mentioned a little bit more detail about
where that comes from so 45 MGD is what we use is what we felt was an acceptable minimum
capacity for an emergency use situation um and so all of these options are you're going
to see 45 MGD for the capacity um startup time after construction for this option would be
one to two days uh the construction itself would take a couple of years but then after
it's finished it would be maintained in a standby mode and could be brought back online
in a day or two um the water quality from this option would be compliant meaning it's safe it is
disinfected but it's hard water it's not the soft water we're used to today um so we're trying to
minimize costs with um water quality outcomes um ongoing labor needs this is going to require one
full-time employee to maintain Those portions of the plant that have to be maintained in a standby
mode so the plant could be brought back online um total Capital cost in the range of 24 to $29
million uh 20e life cyle will cost 28 to $33 million and again so option four is the uh second
choice recommendation of the committee option five is the uh staff and um steering committee's First
Choice on what we think would be the best use to funds in this U situation it's exactly the same
as option four um in that we are using groundwater only the source water is disinfected like like
option four it's still producing hard water the difference here is that we are not constructing a
new disinfection building um and the idea here is that we don't know if we're ever going to put this
plant back into service we don't necessarily have to spend money constructing a new disinfection
building we could wait for an emergency to arise and then bring in tanker trucks of chlorine and
ammonia for disinfection um so we'd be setting up a temporary disinfection system we would still
get Safe Water we would save about $13 million from the construction cost of the disinfection
building however um the flip side of that is that those cost savings are negated if this is
a long-term emergency so using the temporary chemical feed system is a higher cost if it
drags out longer than 6 to 12 months so now we're adding in another variable about what
kind of emergency is it and How likely is it that it would be something that would last longer
than six to 12 months I do have a quick question yeah regarding so the capital cost obviously
the initial investment the 20-year life cycle is working at 15 to 20 million so we're talking
about a million dollars a year to maintain that um 3 to four million uh yeah going from the the
lower end to the upper end of those ranges it's 3 to four million to maintain and that's based on
the one full-time employee Labor uh chemicals and electricity costs added together over a 20-year
life cycle maybe reading this wrong so 20y year life cycle says it's 15 to 20 million to maintain
so it's the operate it no I'm sorry that includes the capital cost oh that's inclusive of the
capital the 20-year life cycle is inclusive of the capital cost for all of them yes sir
I'm sorry so Capital cost is included in that 20-year life cycle cost um so we'd be looking at
11 to 16 million um for The Upfront Capital cost and then an additional 3 to four million for the
maintenance needs and to maintain over the course of 20 years to keep it in a standby mode thank you
yes and the life cycle costs those are paid for by our water rates yes and I have a a slide later on
the budget we currently have available um but we already have an item set aside in our CIP and in
our proforma for this purpose so this would not be depending on the option that we go with um it
may not be a new ad if we want one of those higher cost options we would have to find funds to put
with what we have now um so this is on a future slide but just so you know looking at the table
we have $27 million budgeted in the CIP for the future of the main water treatment plant and um
ongoing life cycle costs we have $300,000 per year right now which would be enough for this option
okay yep I'll be looking out for that slide thank you all right option six this would be using the
current plant um much like we use it today we would be treating a a blend of uh Source Waters
just like we do today groundwater and surface water both um that's a different treatment process
uh we still get a capacity of 45 MGD because again we're rerouting water redirecting water away from
the new plant to this plant in this scenario um startup time would be about one week uh again this
is after Construction Construction Tes longer but the startup time for this would be about 1 week
and that's because the treatment process takes time to establish the right conditions for
this particular water treatment method um the treatment process requires a polymer and some
other chemicals to build up in concentration before the treatment process will work uh so the
finished water quality on this option is compliant safe it's been disinfected and it's also soft
like what we have today so this would produce a water very similar to what we're used to having
today um labor needs for this option uh two full employees per year and that is because we
are maintaining more assets than the previous option we're maintaining what we need for both
groundwater and service treatment Capital cost for this one $14 to19 million 20year life cycle cost
including that Capital cost would be 22 to $28 million um with this option we are constructing
a new disinfection building again so putting that back on the table option seven uh same thing as
option six but now we're taking that disinfection building away and going back to using a temporary
disinfection system bringing in tanker trucks on a temporary basis uh startup for this one is again
about a week um and while this is the cheapest option staff and the steering committee felt
that the longer startup time makes this on both F six and seven uh much less desirable because
at this point if we are an emergency situation where we find ourselves with no running
water at all a week is a long time to wait um Capital cost for this item is very minimal
we could actually we think absorb that within our operating budget um 20-year life cycle
cost is the cost of the two uh full-time employees chemicals and energy to maintain
so8 to9 million life cycle cost for this one um budget considerations so there are a few
unknowns that we haven't accounted for in this that could may or may not uh impact the final
number down the road um pending lead and copper rule changes by the EPA is one of those they
actually published a new rule um within the last week or two but we don't yet know how kdhe
is going to apply that to our situation so in the lead and copper rule there's a requirement
for corrosion control Ortho phosphate feeds um our new water plant already already meets that
we knew what this requirement was going to be our new water treatment is plant is fine the main
water treatment plant the current water treatment plant meets the Legacy regulations we don't
know if kdhe would require us to upgrade it if we were going to keep it in service so um that
could potentially add a cost for an additional chemical feed system that we would need um also
keep in mind again that the life cycle costs that I've presented you with do not include emergency
operation so this includes construction to prepair the plant and then um ongoing maintenance to hold
it in a standby mode does not include the cost of an actual emergency do we have any any belief or
any information that the EPA could be making these changes anytime soon like is there a certain date
that they would um make this buy we should know fairly soon like I say they've already published
the rule now we need to find out how kdhe is going to interpret it for us so um that's a question
we're going to be asking them before we move into our next phase okay thank you um as I mentioned
we have $27 million currently budgeted in our CIP for this purpose um we also have programmed
$300,000 per year into our reforma for ongoing upkeep and this is the same same table I handed
out same table I put up earlier um just to recap uh and have the summary all in one place uh
remember we don't have a slide for option 8 because uh we did not dig into that one after
deciding there was not enough drivers to add capacity at this point um so our staff and our
committee recommendations again are options five and option four and I'll explain why uh here in
a minute uh some additional points to consider a lot of the components at the main water treatment
plan are at the end of their service life but they could be rehabil itated to serve some beneficial
purpose uh the new water plant provides a high degree of redundancy but is still a single point
of failure in the event of a catastrophe uh adding capacity does not appear to be warranted at this
time and like we talked about earlier we are trying to balance the cost and benefit of how to
use this plant against an unknown risk and what's a reasonable startup time so putting all of those
ideas together is exactly what we are trying to do um and that brings me to our recommendations so
both staff and the steering committee um came up with our first recommendation being option five
um and that is to use the plant for emergency use only we would be treating ground water
only no longer capable of treating surface water at that point um option five had the
temporary disinfection setup option to save upfront Capital costs um that option is the lowest
cost cost with the shortest startup time was the primary driver for selecting that one first um
alternate recommendation that came out of the steering committee was option four um again using
it for emergency use only groundwater treatment only uh with the new disinfection building
that would make it more readily available um for a long-term emergency this option had the
second lowest cost with a short startup time um and it was the most economical option
for emergencies lasting longer than 6 to 12 months so today we're presenting these options
to you um like we've covered earlier we're not asking for a formal decision today but for your
feedback um if you think we are moving in the right direction our next steps are going to be to
start talking about what's the optimal design and construction delivery model for option five unless
we get feedback from you to move in a different direction um after we figure out um construction
and delivery model uh we would be coming back to council for approval of a formal concept and
project delivery method um after that point we'd be issuing an RFP for design and Engineers
cost estimates um and then construction would begin after the main waterer treatment plant comes
offline probably in 2026 so um we're not in any rush to make a decision we can take our time with
this if we need to um looking for any feedback you guys have any additional questions you would like
us to answer um before we start moving into our next steps as staff can I ask a question regarding
option number seven which is a blend required so that is how our current treatment plant is working
can you talk about the blend that is currently used between surface and groundwater versus the
new water treatment surface and groundwater um a little bit and I'll have Gary probably in the
parts that I can't um historically we've used approximately a 50/50 blend at the current water
treatment plant um and the the current treatment plant the old plant requires a blend it is not
capable of a treatment that that treats complete uh groundwater or full surface water so we have
to have a blend there um at the current water treatment plant the new water treatment plant will
be capable of operating on all surface water all groundw or a blend um there are pros and cons to
more groundwater more surface water it does take a different mix of chemicals and and treatment
methods as far as the current blend I don't know if anybody is able to speak to that I Laura you
did good with that we probably are actually more somewhere on either side of well on the higher
side usually 60% from cheny 40% from The Equis speds for the same reason she explained sometimes
we in this drought we have tried to push closer to 50/50 uh so what happens during higher demand
times of the year we still need both sources we we've got only have certain amount of water R
we've got all the water rights at cheni we all know that cheni is struggling we've got a certain
amount of appropriated water rights within the wellfield during our higher demand times of the
Season we've it's still necessary to use a pretty close blend of both but as Laura said and we'll
be doing this during our performance testing is running through the different blends we'll be
running 100% surface water through the plant 100% groundw and a blend right in between but we
have so much more flexibility with this new plant which helps us be more um U drought resistant and
be able to respond to the drought conditions and I think that you know that last item that you asked
about was probably looking more to the Future and being able to provide capacity one thing I might
mention is if we end up at a spot where this plant stays there right which is our recommendation we
do have the ability in the future if growth takes off uh if our community really expands and we have
a need based on industry whatever it might be uh Laura showed those uh estimated capacity demands
up front we ever started pushing up against that we can take a look at bringing this facility back
online as a water treatment plan and increasing overall capacity that's not out of the question
it's one of the values of keeping it there while I'm here I'll give you one more uh something real
quick and and we'll and we'll get more information together for you when we bring this to council
back on that very first one with the estimated cost it's going to be very time consuming and very
meticulous taking this plant apart because of what it's been used for we expect that there's going
to be some regulatory requirements and permitting requirements of what can be done with disposal of
certain equipment for those of you that have been through that plant and seen the close proximity
and the tight quarters of what it takes it'll take specially ized equipment to take some of
this apart uh there's going to be some requ uh requirements for sanitation of certain parts of it
there is a lot underground that most people don't see and that work would be done in close proximity
close proximity to very critical infrastructure as you know has Pump Station stays in operation we've
got large piping that continues to surround the perimeter some of Laura's uh diagrams showed that
so we can't just go in here with a wrecking ball and an excavator and take this out it's going
to take time that's where that cost starts to jump really quick and then to be able to make
it a buildable site it's going to take some engineering fill you don't just shove sand
back in the Hole uh that's where we start to add up those costs really fast uh to get to
that 50 to 75 million number oh Gary you just let the Scrappers go in they'll get it taken
care of in two weeks we could try that too um what are the pitfalls to number seven why is
that not a little further up the list as far as recommendations uh the main reason that one
was not higher up on the list is because of the startup time um so six and seven would both
take about a week to start up not counting the construction but even after construction
is completed uh due to the water treatment process six and seven both take about a week
to actually come back online to De develop the uh concentration of chemicals that are needed
to treat the water with this method can you uh further add because there's a difference
between six and seven with soft water which is what we currently have versus hard water in
the options that staff recommends which is four and five the difference and in how a customer
uh would feel the difference um they would be getting hard water with options four and five
as opposed to soft water that we're getting today um if anybody's familiar with your typical
well water in the area that's going to you know have the potential to leave behind a a residue it
could be different um it could have an impact on uh Industries in the area that use a particular
hardness or softness of their water so it could have an impact to change the um the water quality
that we would be producing but again we're only talking about this in terms of an emergency
use so if we have a catastrophe at the plant um this is providing um running water water
safe running water to customers um it's not ideal and we'd obviously like to get it back to
the the water quality that we're used to as soon as possible um so this is uh this is a really
an emergency use only situation designed to be temporary and just to be clear if we ever do
get our economy takes off we need more than 120 there's plenty of room with the new water
treatment plant to expand that water treatment plant that's what we were told when we when
there was a uh gave a tour of it there's there's plenty of space we have set the plant
up that it would be uh ready for expansion but it's not cheap uh and so I think at that
time we'd still have the option to weigh uh expansion of that plant versus what we
could do with a current plant and and see where we end up best economically I have
a question this kind of goes back a lot of slides too just for historical context
um when we go back to slide I think it was 30 just because I think it goes with councilman
Johnston's question what happened in 2005 that we had that high of water as far as I know
it's not something that specifically happened but water usage across the country um has been
declining since 2005 as um water conservation and and more water saving devices have become more
prevalent um so I don't think it was necessarily A a specific thing that happened um but it's
been trending downward across the country uh for for um just water usage Trends in general
okay it just seemed like an outlier compared to everything else um now going back to the
other slides um I think staff's in the right direction I'm very interested in emergency use and
bringing it up as quick as possible a day would be incredible there's not that many communities
uh in the country that would be able to do that now when we look at slide I think it's 28 well I
don't know what it is actually on yours it's um the last Slide the budget considerations and
comments yeah so it's the currently budgeted is the capital overlay of uh 27 million
that's in this is that budget in the CIP currently yes budget in the CIP was that part
of the original budget allocation of the the water treatment facility as a whole or was
this added subsequently or was this part of the original budget when we were uh doing
the design of the water treatment facility I believe has always been a separate line item in
our CIP it but it's been a separate line item for a while it's not added later on okay and then
so because it's budgeted because the ongoing maintenance is budgeted this in particular would
not be an increase to water rates because we're not adding anything this is already budgeted
this will not increase rates based on any of the proposals with maybe the exception of one
and four parts of six correct correct um but I will say these are high level cost estimates we
would still need to go through our our diligence of getting a more refined Engineers cost estimate
so these numbers could change um but we expect it to be enough for most of the emergency use options
so you know when the public hears about this when the media reports about this adding redundancy to
our system with the exception of or most of the options will not increase water rates correct
for the redundancy aspect correct we've known this is coming we've had it accounted for for some
time so thank you I think the question has to be asked too what else could could we do with that 27
million well you if I mayor if I can that that's going to be discussed next because there are a
lot of pressures on our water rates right now that go to refined cost estimates for operation of
the new plant was inflation has done to us since our original estimates as well as our Capital
needs for the plant and so we're going to talk about all that next so if you have savings if you
spend less than what we had budgeted that's going to help us in terms of our overall proforma so
which is why I would like to see number seven have a little bit more research uh given that that one
is the one that provides the greatest cost savings but it also doesn't take into account the next
conversation which is water rates and Sewer rates right so if I could jump been on that I served on
the committee we actually talked about that quite a bit and number seven was the first thing I asked
about the question that the council has to decide is do you want half a million people to wait one
week to be able to access water or one or two days and it really comes down to that the soft water
um I think is probably the preference for everyone but if something catastrophic were to happen our
decision would be either allowing water access in 24 hours or 7 Days that's really the Crux of what
we have to decide I also have one quick question we talked about uh tornadoes we've talked about
earthquakes we've talked about floods one thing that's not in this proposal regarding is acts of
terrorism cyber attacks any acts of terrorism well both of these um plants be on separate systems so
if one was attacked um in terms of a Cyber attack other one isn't mitigated is there a possible way
to mitigate those on two different systems or is that even possible I don't know the technology for
that that's the discussion for another time okay okay all right well that is all that I had
so there any other questions we can come back with a little bit more information
about the questions you asked today um I would just say thank you I can only imagine
how much work that was and I appreciate you bringing forth so many different options
um this is in my district and it's such a cool building and has so much to offer so
hopefully we can um find the best option thank you mayor transition into the rate discussion
now um and as I mentioned this there are a lot of moving pieces on this one so Gary's gonna
summarize where we are today and by the way we wanted to bring it to you early um many times
we wait until November or early December and we thought the council would want some time to think
through this before we actually bring an action item uh thank you Bob uh mayor and council members
again Gary Jansen Public Works and utilities I want to thank Laura she did a really good job
with that appreciate all your questions so that we'll we've got some more work we need to do when
we bring that forward but we certainly appreciate your input so want to talk about uh where we're
at on annual Water and Sewer rates discussion uh what our projections are particularly in
compared to what we've looked at over some years now since 2019 what kind of projected rates
were at that time uh the manager mentioned we've seen some considerable pressures especially with
inflationary impacts uh and some other issues that I'll talk about as we we go through here that lead
to what our our current recommendation is going to be uh so we'll talk about rate drivers in a
10-year expenditure history I mentioned the record inflation I'll show you some specific examples
of where that's impacting us uh CIP uh and onm factors um obviously the CIP is a big part of this
and what we do with utility and I'll I'll talk in more detail about that uh efforts to maintain rate
predictability over a longer period of time again start back in 2019 in particular we we wanted
to to provide as much predictability as we could looking at over a 10-year forecast we still want
to do that we still want to keep these rates as flat as we can and avoid spikes anywhere but uh
because of certain economic drivers we need the ability to start being a little bit more flexible
from from one year to the next and so I'll talk about how those things wrap together we've got
a recommended base adjustment with the resulting debt coverages which is very important to our
performer and how we look at how this all rolls together uh what the impacts would be on customers
our rates versus pure cities uh and then the affordability and assistance programs which we
think are very important annually to discuss with the council we've got some routine user fee
updates that happened every two years and then some other options including where we're at with
late fee percentages the conservation tiers which is something we talked about before we uh going
into mandatory water restrictions want to kind of hit on that again uh to see if that's something
we want to discuss for the future future and then the summary and next steps so the same I mentioned
the same rate plan has been shared with the city council since December of 2019 this line that
you see on here probably looks fairly familiar uh despite many significant changes uh since
that time the rate plan has not changed and and some of that has to do again with our Our
Hope and priority to keep uh rate adjustments predictable over that period of time still want
to do that but we need to look at at at going in a little bit different direction than where
we had been with that 2019 plan because of all of these things that we're currently looking at
that plan is no longer sustainable due to record inflation operational changes and other challenges
additionally onm costs related to our new water treatment facility that were previously estimated
are now known I mentioned before and I want to mention again our goal is still to keep uh the
rates level and avoid raid spikes anytime that we can and I think we're still doing a good job with
that even with the recommendation that you'll see today and moving forward so looking at uh really
big factor here in our discussion today we could probably focus on inflationary impacts and what's
that what that's done across the size of our operations uh and the maintenance of our utility
more than anything so look at a 10year history the Blue Line being water expenses green being sewer
um the our rate model assumption ions going back to that 2019 rate model that we looked at were
3% o andm inflation that included estimated debt based on the CIP and additional expenses Beyond
inflation that are factored in individually and what those are anything that's new changes in
commodity costs Staffing anything that wouldn't be considered part of just an inflationary impact
to O andm those average onm cost increases in the past three years have been 10% in water and
7% in sewer so you can see that alone is a significant difference from our uh projection
of what happened uh our projection of what we thought might happened back when that 2019 model
was developed um our consultant our Financial Consultant for developing the cost of service
analysis in 2022 new J they had recommended at that time in 2022 increasing inflationary
assumptions they also recommended higher rate increases than were ultimately put into the
2019 plan we made a decision at that time to go ahead and move forward uh with those lower rate
increases uh to see what would happen uh not not look to raise things right then we are now at that
point that we have seen the impact since 2019 what has happened is what was predicted at that time
and so we need to be able to address that going forward these are some specific examples
of what's happened with uh inflationary impact to our operations and maintenance on
the left is chemical costs uh the blue being for water green being for sewer after holding
steady for years chemical price has shot up two Mill $2 million in just the past three years uh
we're not sure yet where that's headed keeping a close eye on it uh but keep in mind we've got two
plant two water plants to run for some period of time uh adding to those Commodities costs uh
which inflation will impact the if you look to the graph on the right shows what the impact
to Contract Services versus the savings from um Staffing vacancy so the red line is salaries
and benefits of our staff while you do see some Savings in that uh it's not offsetting the
increases that we've seen in contractual costs due to inflationary impacts we're still doing what
we can to get people hired but we are struggling in certain areas uh especially on the water
side and water distribution some of the things that we've talked about before uh related to
salary impacts in the market but right now being able to make things work this way that Gap
is really starting to close uh but we're not able to offset those contractual savings with savings
from Personnel again due to inflation um Gary since last week's um this is specific to last
week actually contracts and water um operators have you seen any uh increased interest since last
last week just knowing that media covered it uh we talked about it and then we really raised
awareness that we need more water operators experience we did get a lead on one operator uh
almost immediately afterwards I don't know what that can be led to so we're working on that still
working with HR uh through some of the things we talked about as far as providing additional
incentives we want to get our own staff an opportunity to consider that but we hope to be out
on the street really getting after that soon so we're hopeful keep our fingers crossed we got
off to a good start we'll see if that one pans out um some other things uh not all increases are
as drastic as chemicals and Contract Services but still add up to a sign significant impact and
these are just some small examples but things that we look at across the entire utility some of
those examples are Bank fees being up 156% energy and other utilities up 12% technology charges
20% and insurance premiums on our facilities up 47% collectively it really starts to add
up compared to what we had projected within our model for inflationary impact so I want
to talk about changes related to witto Water Works this is on the operations and maintenance
side I'll talk about the capital side in just a moment so if we if we start at the left and look
at 2019 assumptions um the chemicals for a new water treatment plant were assumed to be $269,000
increase starting in 2025 at the current rates again impacted by inflation that would be $721,000
starting next year that's a big increase just by itself energy for the new plant was estimated
to be $600,000 with that increase starting in 2025 that is now estimated to be $900,000 those
unit price inflations again since the time of original estimation five years ago almost six
years ago Staffing uh at the time keep in mind in 2019 we were just starting to develop design
of what this plant how it would operate what it would take for Staffing of the facility we had
assumed in 2019 that temporary Contract Services costing just under $600,000 in 20124 $1.2 million
in 2025 would be utilized for the transition period and no on additional ongoing expenses
more so than more o over than just our staff to keep the new plant going since that time uh as
we've figured out the complexities of this plant so I would tell you that this question's been
asked a lot so this plant was built designed and built to save on capital costs in particular
if you keep in mind what we've talked about uh the funding sources that we utilize with whiffy
and srf save the right paays over $180 million on this project we did everything we could because
of the size of this project to keep Capital Pro uh keep Capital costs down well this is a new plant
there's new innovation there's new technology that doesn't mean that it takes less people we have
come to find out over time that we're going to need more staff than we've got now to make
sure that we keep this plant moving forward especially during the first couple years like
anything new and especially something of this size and complexity we're going to need more staff
we got to make sure we get this right during the transition period and going forward so the current
assumption then is and5 million in 2024 just over $2 million in 2025 and that would be ongoing
what happens at that point once the old plant comes offline uh we may have we'll we'll start
to have a better idea of just how many staff we do need and I think we start to balance that out
through a couple ways we balance that out through attrition and something I'm going to talk about
on the next slide is we're going to be moving towards uh finishing up our BNR improvements in
26 and 27 some of that staff we think probably will move uh in that direction because we are
going to need additional resources there also just like we need now so um the again the original
plan was to contract temporary surface providers for the transition period the decision was made in
conjunction with city council and discussions we had to hire our own staff mayor the point you just
brought up we're continuing to work on that uh and hopefully we have luck of finishing up hiring The
Operators because we've got pretty much the rest of those 20 positions filled at this time but one
thing I want to mention while I'm on this SL is it's a question that comes up often including
when I've been here uh and just in the last few days about this discussion the capital costs
for this project are all part of the current rate structure anything that we've done and brought to
you on the capital side we're currently at $569 million overall Capital cost that's all part of
the current rate structure in March uh when the city council approved an additional $16 million
that was part of the current rate structure we had that build in as a contingency knowing that
there were some things were going to have happen offsite in particular but not knowing those
costs up front so anything we're talking about today and when we talk about where we're going
with a recommended rate increase none of it has to do with the capital cost that nearly $600
million cost of the facility but it does include uh the need for some additional Operational
Support and Staffing as we're discussing here talk about changes related to our B&R project
I just mentioned but I'll hit on this again so for salaries and benefits for Staffing in 2019
Inception was just over $500,000 starting in 2026 that's an increase in a $1 million in 2027 uh
continuing indefinitely with annual inflation we don't have any changes yet uh we will be working
on a market analysis over the next probably 12 to 18 months just like we've done with the water
treatment plant uh to be able to uh determine the impact of this assumption so I think we've got
the ability to come back to that probably this time next year and see where we're at uh based on
the rate projections at that time chemicals and energy uh in 2019 we assumed no changes based
on information available at that time in 2019 we weren't near as far along with development
of a B&R plan as we were for wit Waterworks uh right now the current assumption is an additional
$864,000 in 2025 1.7 million in 2026 for chemicals energy is just under $150,000 in 26 and double
that starting in 2027 and I know I've belabored it already but just to remind you that's inflationary
impact so you know we'll hope hopefully only hope we only get us so far but we'll hope that we'll
start to see some leveling out of the inflation are impact steadying that out that goes back
to my point of the value in us being able to evaluate this with you on an annual basis uh and
hopefully being able to regardless of what our projections may have been in the past further out
that we can balance those out come back find ways to create savings or at least deal with this on
a year-by-year basis more so than we had in the past one thing I mention on that too is the Odor
Control technology selection and treatment process better defined the concept and the final design
of BNR Odor Control is a huge component of BNR something we've talked about a lot we wanted to
make sure we got that right once that process was better defined it helped us to kind of dial in on
what these numbers look like so talking about our CIP and and what this does uh for dictating
what the rates are so utilities is a capital intensive business we maintain you've heard me
talk about these numbers before but I'll just run through a couple with you real quick because
I'm always impressed when I when I look back and see just how large our system is and what it
takes why we have this R structure in place for um improvements infrastructure operation and
maintenance everything that we do to run the system we maintain over 4,500 miles of water and
sewer pipes 60 sewer lift stations eight treatment plants of various types 160,000 water meters
uh of 56,000 sanitary sewer man holes 53,000 water valves a lot of stuff going on stuff that we
need to continue maintaining on a regular basis to make sure we can provide Clean safe water for our
community all of this is needed to serve as Lura mentioned 177% of the population of the state so
the pie chart on the left shows that most of the revenue increases that we derive from the rates
uh are needed for infrastructure and you can see the orange being CIP the green or yellow being o o
and m so we utilize the CIP though for renewal and replacement primarily so it's also helping us with
operations and maintenance it's helping us replace old assets old facilities I work really close with
our staff uh and encourage them to really stay on track of keeping capital projects moving because
the value that it brings to our daily operations staff to keep our facilities upgraded so that
we can limit hopefully and reduce the amount of deferred maintenance that's where the CIP becomes
so critical if you look at the top uh chart on the right it shows a 10e sewer CIP by function
and I'll talk about some more details in just a moment the blue being renewal and replacement the
orange being expansion and I'll show you what some of those look like 10year water CIP is on the
bottom looks very similar uh blue being renewal and replacement is the majority orange being
expansion there's some other that's in there for a new treatment plant that we didn't categorize
just yet but just so you know what that's for but we really gained so much value uh out of what's
in our CIP here but there's some additional slides to this packet uh that if we get to I kind of
wanted to have for backup if we don't if you have a chance to look at that shows what we've done
to rep prioritize capital projects in an effort to stay within the current rate structure for
this year and to minimize the rate impact going forward but it's so valuable to still be able to
have those projects in there continuing to talk about the CIP the 2025 to 2034 approv improv CIP
includes almost $800 million in water and sewer improvements that 10or CIP does not include some
of the things you see below it so all in or Debt Service uh within the current rate structure is
almost $2 billion so you can start to see how all of this adds up when you look at the inflationary
impacts and operations and maintenance what is needed on the capital side uh to keep our system
in the condition that we need it to be in and keep it moving forward I'll talk about some of the pro
on the right um so that you know so distribution Mains replacement for water uh that is replacing
existing uh neighborhood water mains that's where we've uh gained a lot of ground over the years
when we talk about lead and copper and removal of lead service lines that's where most of that's
been taken care of it provides uh uh a lot of good things and improvements for neighborhoods I'm not
going to hit on all of these phase water supply plan which is shown as expansion that is actually
focused uh for looking at long-term water supply that's uh recharge basins and the Eis beds so that
we can keep the aquafer in great shape that is improvements to the local wellfield where we have
water rights around the current water treatment plant so that we can maximize those water rights
especially now in times of drought um there's other things that's going on with has pump
station within the sewers there's an expansion project right in the middle called sewer Mains
for future development that has been a critical uh key to furthering development in our community
uh providing a a the ability to fund projects up front sewer is the most expensive aspect of
being able to expand and to develop whether it's residential or commercial so that's been the
commit City's commitment for some time that's all part of what we're looking at I mentioned the 60
some lift stations that we have so we have annual funds in there for uh rehab and replacement of
those lift stations to be able to keep those C IAL uh infrastructure going Gary can you go back to
that slide um I think this is a nice segue I think um we get asked a lot of questions especially
during this drought about getting water from eloro Lake and I want just to give perspective to
the capital Improvement projects already underway regarding water what would something like elero
Lake if we even had the water rights can you talk about just approximate dollars so we had projected
and you'll see it if you look in the back slides looking at the idea we have a single pipeline
from cheni right now approximately 20 miles we had projected uh in the future if we were going
to add a redundant line replace that line starting to approach a $100 million so it kind of depends
on size may not need to be as big but it's going to be probably somewhere in that magnitude to
be added to this if we were ever you mention mentioned and and I won't get stuck on that part
that it's just really not feasible even from a cost perspective to get that water but it it would
be expensive to bring a pipeline all the way from ELO we we also did a study uh working with city
of eldoro uh who was more than happy to uh to work with us um and what we found our consultant
found is that at the time that we got into significant drought that would be the period of
time that El elero would had the least capacity be able to help us so if we needed a constant source
of water during to meet our regular demand that's a very different scenario than simply needing
help during a drought period And I I Gary I don't know if you want to talk any more about
that but we we did do do diligence and again appreciated the opportunity to work through
that with elero I'm glad to hear us continue to tell the same story so I got that from you
before so we're on the same page that's great good on that uh continuing to look at rate drivers
um um and I might just kind of remind I just want to make sure we have a good understanding and
I think it's good sometimes when I talk to the public too they don't quite understand what all
goes into when they pay their water bill and so we wanted to be as comprehensive as we could so
if you look at uh part of our debt service and the debt Pavements and the principal and interest
so this chart reflects principal and interest payments on revenue bonds withy loan loans and
srf Loans already in place uh you can see if you kind of start from the left the principal and
entrance interest had been holding steady but is getting ready to shoot up and and that's a result
of market conditions you never know what happens going forward we'll keep a close eye on this um
but some of these don't necessarily change the terms of the loan dome but I just wanted to show
this as the impact also uh to our overall perform and rate structure so talk a little bit more
about some efforts to stabilize rate adjustments uh in addition to same some of the things we've
already hit on so in one of the backs slides to and I didn't mean to Short Change yet but I wanted
to make sure we could get to the things we wanted to but there's some additional slides behind the
what would be the ins slide here that I can hit on too it shows what we've done with our utilities
optimization program I want to mention real quick Laura has led this effort for some time and
done a tremendous job working across all of our facilities to find ways to optimize savings
and and I can show you that on that other slide and what that means but it I think it's going to
work even on our new plant as soon as we get going we're going to start looking at ways to optimize
Energy savings uh what we're doing with Staffing I talked about all these things that Energy savings
chemical savings um but that's our goal uh with what she has done and with her group from an
asset management standpoint I think is really helped so that's already included in here some
other things that we've done for for example the call center saved just over $111,000 by adding
five full-time staff and and eliminating the use of temporary services which resulted in wait times
and other metrics being improved in the process so always looking for those opportunities $100,000
in the grand scheme of things is not a lot by itself but multiple items like that really start
to add up the eil campaign increased the number of customers built electronically cutting Printing
and postage costs by about $5,000 the first year again not a big number these are opportunities
we're always looking for for savings got great staff that's looking at these uh what we can do
I hear it from them constantly so operational savings are not enough to overcome inflation and
other challenges continuously reviewing the CIP for opportunities to defer revise or eliminate
projects I talked about uh what I said when I encourage staff I spend time with them to we've
got a pretty good structure in place where we continue to review the CIP especially looking at
any time in during the year where we're starting to see stresses and pressures on the proforma on
the current rates where we need to start moving some things out we do the best that we can to
balance that this year we're kind of getting to a point that there's not much else to balance out
or to mve out we've reduced contingency levels in the financial model over time which is not always
ideal we need to have some level of flexibility and resiliency to be able to respond uh to unknown
things that might happen and I'll I'll talk about this a little bit more in just a minute when
we talk about the impact of the drought which really we don't know yet and it's not impacting
this discussion today but it could going F it could be going forward uh We've pursued favorable
financing opportunities which we've talked about before with whiffy and srf so this chart will
look familiar to some of you uh back when we started talking about the recommended rates in
2019 showed the difference in rate projections with and without wifia and srf so the red line was
a Combined Utilities rates without wifia the blue line was combined with wifia and srf the you can
see those double digit rates projections in the early years was not desired by the council and I'm
certain it was not desired by the community that eventually came down uh to the rates that we've
looked at from that 2019 model to stabilize and level out over a longer period of time um there
was a discussion about generational Equity with the council at that time it probably makes sense
so that as many people as possible are paying for these major project improvements right so those
boxes up to the top right at the time when it uh projected the 2028 customer bill you'll see on the
right with wiffy and srf the projection was $16.32 with the uh recommended rate increase that we'll
be talking to you about yet today and then coming back to the council later our uh the majority
of our users the mid-level user let me say this first because that was based on mid-level use
the mid-level user would be at 10929 so we've still even come down from that um $7 a month the
majority of our users uh which is a less use their bill would be $73 54 Cent so it's not necessarily
fair comparison because this was midlevel but I just want to kind of give you some perspective on
on what those numbers look like so getting to the point of rate adjustments what our recommended
base rate adjustment is going to be compared to as it was in 2019 so the orange line it's
2019 rate plan looking out to 2025 recommended a rate increase of 5.03% here in December is a
recommended combined rate increase of 6.14% all of the things that we've talked about play into
this we think it's important uh to be able to move forward with the projects that we've that we need
to do I talked about on the CIP side the impact that has on onm I'll show you what that means for
bills in just a minute but I want to talk about what this includes and what it doesn't include
so this would include the full adopted CIP and reductions or revisions propos proposed by staff
so we have uh split some things out move some things out that's on some later slides to help
accommodate this so this number is not higher the adopted budget all existing debt two remaining BNR
uh srf loans for BNR not issued yet future revenue bonds what we talked about for witto Waterworks
transition staff and Contract Services and that this mentions the $300,000 annual onm for the main
water treatment plant Laura talked about that is already in I just want to be clear that is already
in the current rate structure this recommended rate increase is not needed to accommodate that
but I just want everybody to know that's one of the things that's included what's not included
is funding for changes and lead and copper or emerging contaminants P regulations Laura talked
about that we should know more soon if you had the opportunity I sent some information to Mayor and
council members recently about where we're at on that uh there's not an immediate timeline on what
that's going to happen but there's some unknowns of particularly of what happens on the private
side I think we've got time though uh once we figure out what that looks like to start looking
at Future rate structures and how that might play in revenue losses uh are not included from two
wholesale customers who are building their own treatment plants Derby is working on building a
water treatment plant they don't have enough water rights to take themselves completely off of of
being a Wholesale customer of ours but what they would like to do is be able to take care of the
peak demand times on their end which is good for conservation for us but it has to be factored into
our Revenue projections city of Valley Center is looking at building a water treatment plant that
would take them fully off of our system timing isn't sure yet but we'll be looking ahead at what
the impacts those would have I mentioned before this does not include revenue losses or operating
cost increases due to prolonged drought conditions so I don't know what the number looks like we know
during September compared to our projections we did have a loss in revenue of where we thought we
would be had we been under normal conditions with precipitation uh I talked about building capacity
into our rate structure that's something that helps because of those types of unknowns we'll
see what happens this spring if we come around to being in the same place hopefully not but if
we're still under water restrictions we'll have to evaluate where we're at um and see what impact
that might have on our Revenue the the I get asked about this lot in the public because there's
concern that we're telling people to use less water and then we're going to are we going to are
we going to raise rates that's the question that's asked one of the reasons why I want to illustrate
just the size of our system and what it takes to um operate and maintain a utility of our size this
is built on a long time of of building this system to accommodate uh 500,000 people within our region
to be a regional water provider that's based on uh projected Revenue over a certain period of
time and anywhere that that changes whether we lose customers whether we lose Revenue because
of the drought we have to make that up somewhere else to be able to operate and maintain that
system the same way and make those Capital Improvement so we'll see where that goes uh we
don't think we need anything else within this current recommendation to accommodate that we've
got some other things that are going on to help respond to the drought that we hope will make a
difference including new water treatment plant uh and then so that includes the discussion of
additional contingencies to provide resiliency which are not included in here Gary can you go
back to that slide um the wholesale customers can you uh again want of talk about how many wholesale
customers we currently have and that they do pay a premium for this water um but can you talk about
our relationship with other Regional partners because we provide 177% of water for canons is
that right we do our our population is basically 177% of the entire state so our population that
we serve including the wholesale customers we have 11 wholesale customers that includes eight
neighboring communities and three Rural Water districts um the majority of those wholesale
customers play a uniform wholesale rate that is more than our rate pairs in Witchita pay um
effectively we looked at because the question came up about our tiered structure which I'll talk
about in just a moment moment how that compares to wiar Residents paying an intered structure
wholesale that wholesale uniform rate ends up paying out more than even if they were in our own
tiered structure so it costs more to produce that water it costs more to get that water there uh
there's been a lot of analysis done over time with our cost of service analysis um looking at
being able to for cost recovery and so I think we're in a pretty good place with that and because
of the discussions we've had with the drought uh concerns from some in the community about how
these contracts were set up we are re-evaluating where we're at uh on those customers but I think
right now we're in a pretty good place uh for that reason I guess it's U more of a consideration
just making sure that cost recovery is top of mine while still being a good partner um I think
when we talk about whether it's parking downtown um cost recovery has to be part of the convers
ation um so that folks understand that there is a cost to maintain a lot of this infrastructure
there is thank you so resulting debt coverage is something that we keep a really close eye
on uh staff watches this closely our bond Council watches this very closely to maintain
the utili doublea minus credit rating a debt coverage level of 100 120% or above is required
and that's what's required by the credit rating agency I'll show you another slide on this in
just a moment of what this looks like if we if we maintain what the 29 recommended rates would be
but the Revis the revised rate plan provides only enough coverage to meet the minimum requirement it
does not provide a safety net for unseen negative circumstances so again talking about we're still
trying to be prudent here and take care of what we need to take care of but we're still not
really adding in any contingency for now um if we move forward with the recommended rate
increase that's something we'd certainly want to consider maybe then as we come into future
years seeing how things balance out this year with all of the things that we've added in but you
can see that that combined minimum required is the red line that black line touches that for several
years there uh as we've got a lot of things that are feeding into this so customer impacts is
something that we always want to look at with the council and make sure customers understand so
2020 for bill is the second column from the left we a lot of times look at the mid volume user I
will tell you the majority of our users in this community so 135,000 customers are residential
customers they use 50% of the water but they're obviously it's 90% of our customers or residential
customers they would fall in that low volume area generally under 6,000 uh gallons per month so the
rate increase the recommended rate increase at the 6.14% you can see that dollar change for the
2025 plan would be an additional $321 per month for a low user $44.79 for a mid user keep going
further to the right uh that shows a comparison to what the 2019 recommended rate plan was so if
you look at that low volume user the 2019 plan would have been an increase of $250 53 cents over
the 2024 Bill and sorry I know I'm kind of going backwards on this if you look at the difference
between the 2019 plan and the recommended 2025 is roughly 70 cents more than where we would
have been on that 2019 projected path um our recommendation today and going forward would be
additional 70 cents per month for a low user on top of that Pier cities comparisons we always like
to look at the I35 corridor I don't need to spend a lot of time on this but Kansas City Omaha de Mo
Tulsa Oklahoma City and Fort Worth we are still uh at what I think in a good place uh as far as
being affordability for rates this does look at the midlevel user I'm not sure what this compares
to lower users but our total Allin Bill comparison of $92 is 17% less than the next closest with
Fort Worth do have a quick question thank you for showing pure cities are there any pure cities
that are less too you show us as the least of all these Pier cities where there I think in the last
year or two we might have looked at we considered some other cities of comparable size that weren't
along the I35 Corridor and if I remember there was maybe one or two that were about the same or
lower but we were certainly in the bottom 10% of affordability thank you yeah we try to use these
cities consistently for you so you've got um you know comparable cities in the region there's we
used to do out liers and folks on either coast and it just didn't seem to to give you the right
kind we're not just excluding any peer City just because it's lower these are that's no and you'll
notice for a lot of purposes we try to zero in on these cities even when it's not favorable when
we've done comparisons perfect thank you C can we go back to the last slide real quick yeah
uh the one right um are these consistent as far as percent increases are we increasing at
a certain percentage across the board or we are we are same percentage across the board okay so
for Industrial and Commercial as well for for all users not is that not true Jonny very last slide
all right well I'll get to that at the very last slide okay uh good question and sorry I gave you
the wrong answer so we look at EPA affordability M metric every year the EPA considers rates
affordable if the annual cost is at or below 4.5% of the area's median household income so there's
a lot of information here uh the median household income from Census Bureau site for Cedric County
is just over $66,000 which stalls just over $70,000 that percentage for a mid ususer is 1.7%
with the 2025 recommended Bill currently 1.6% for the 2024 Bill still considerably lower uh than
the 4.5% threshold that the EPA establishes for affordability assistance programs is something
we like to always talk about um the and I'll show you what's here and you see the spike in
2023 we talked about last year for assistance programs customer assist customer assistance
funds used federal funds uh from 2021 to 2023 helped Americans with utility expenses in the wake
of covid-19 assistance funds typically come from customer customer donations and on10th of 1% of
water and sewer rate revenues as earmarked by the city council in 2016 in 2024 that on10th of 1% is
approximately $190,000 in 2025 it would be $22,000 customer donations to the H2O program more than
doubled after introducing online giving options this year so private donations in 2023 were
just over $4,000 this year we received 9 $9,000 as of July 31st so uh people can donate to that
through their water bill and so they've stepped up and doubled it from 2023 we are expecting uh
for 2024 to provide $55,000 in assistance uh so you can that's considerably less than what was
available we continue to do everything we can through messaging on our water bills working with
the comm's team at different times when we start talking about our rebate programs too to make sure
that folks who qualify know about these programs because they can provide valuable assistance user
fees I don't want to spend a lot of time on this is something that we do every two years just to
give some quick examples of account this is for cost recovery only we analyze everything that we
do uh um to make these things happen including driving time that was something that we didn't
have included before I can tell you uh when we in our city Engineers office with what they do
for RightWay permitting that's critical that takes a lot of the time so it's got to be part
of that consideration just as an example but for setting up new accounts uh the fee would increase
almost $20 shut off for non payment shut off for non-payment is an increase of $12 remember this is
done every two years standard grease maintenance fee which for routining Clear manholes Downstream
of Grease producing businesses without a trap outside of the building that increases $20 a year
again for full cost recovery backflow testing increases $4 per year just some quick examples
this is all part of what we'll be bringing to you later with a full schedule of increased fees
so who who pays all of these fees for example the grease maintenance is that restaurants only that
would be those that are required to have that by code yeah that'd be restaurants okay and the rest
of them just depending on yeah so we've got uh licensed backflow testers there are companies
that have to be we've got 25 th000 backflower venters across the city have to be tested annually
have to be rebuilt every five years so that's contractors that get those fees uh the first
two or direct fees cost for um our staff to to to be able to to maintain these monitor these
keep track of these everything that goes with administrating these fees so the first two would
would come back to our staff for cost recovery one other thing we thought we might look at
really don't know what this would do uh for revenues because it might end up just being an
incentive to for more payment on time but our late payment fee is equal to 1.5% of the unpaid
balance that's been in place for many many years if you look at these same piure cities um Fort
Worth is at 10% wi to tulson Oklahoma City are all the same we are recommending an increase to 5%
again we'll come back to this when we talk to you formally at the council meeting from 2021 to 2023
the city averaged over 10,000 payment arrangements annually so we try to work with people anytime
that we can on payment arrangements approximately 8% of those were kept so we we had we had to start
10,000 payment arrangements not a lot of them stay in place 8% were kept 5% were cancelled
87% were broken and less than 1/10th of 1% are still active that doesn't mean we're not
going to keep moving forward and still doing that um the utility is authorized to wave fees
when warranted we waved about just under $100,000 during that same period of time costs associated
with late payments are administrative time to update accounts reach out to customers with
calls and notices and eventually send accounts to collection so something we want to think about
again I this isn't necessarily being offered up as a revenue generator it's really hard to tell
where this would end up it could be that this provides more incentive to get more payments on
time which is a value to us also do some of the actions that are on the previous slide as well as
this right now what's happening are for instance those who are not doing appropriately what they
should on the grease maintenance or if they're not making payments or if you go to the next slide
those who are not paying on time those costs are being shifted to the our to our good customers
right to the those who are making payments on a regular basis so the cost we have for collection
we're not able to recover all of that from those who are not paying us especially those that we
have to go into collections because we'll only recover a percentage of that through our final
collection so this is an I you know I like this idea of a late fee percentage increase so that
we can discourage that and not have that burden fall on our regular rate payer what what are some
of the exemptions that we can use the wayers on for people who are late paying their fees good
question we we I I would tell you especially since my time being involved with them but we we
try to really work with people any way that we can any type of hardships that there might be I
mean there's Financial thresholds qualifications first and foremost on the assistance program
that qualify but we try to work with people whether it's changing ownership whatever it might
be I'll I'll just tell you with as many customers as many customers as we have we see people quite
often try and just get out of paying a bill but there are legitimate issues that come up I think
our staff has done a wonderful job of of being empathetic and trying to work with them every we
can I there's I can get you some better examples we hear quite a few different things that maybe
we wouldn't expect but we try to be as tolerant as we can give people a chance and we make
a determination of how far we need to take that well I appreciate that I know we got a lot
of good-hearted people that work for the city I would be more comfortable if we have a policy that
can outline that or maybe some sort of dictation to staff as far as when it's appropriate to weigh
fees you know especially for people who you get a little behind in your bills and it take costs
money to pull yourself out of it we usually don't wave fees but we will give a payment plan allowing
someone to make payment over an extended period of time I don't think there's many times we we'll
weigh fees if we know there's a problem with a meter or if someone's had a leak U that they did
not know about and I think in those cases we have waved def I'll give you a good example and thank
you for that manager we don't ever write off water consumption if somebody has a leak what'll happen
usually is they'll move into another tier we will look at the last couple years during that same
period of time and we'll bring their their rate back to that tier one fear over that same period
of time sub stantial cost savings we don't write off the water consumption just like the manager
said we're not going to generally wave fees or anything else it's working out payment plans it's
working out other accommodations so thank you for that clarification well it's not the fees overall
it's the late fees being able to work through some of the late fees with somebody a grandma who maybe
their social security check went on the wrong day for the month or that's where those payment plans
come into play and those types of agreements so that those can be avoided yes all right one other
thing I can you sorry I'd like a followup to that I I just want instead of anecdotal actual um
situations where late fees are being um levied on someone I think the concept here is that the
water is consumed or water is used you can't put the water back into the system so it was consumed
in some way so there is a cost to an individual whether late or not late so I'd like I guess more
of that information so that we can help Community understand that we the city of Witchita tries its
very best to accommodate uh individuals who may have just forgotten but they but we are trying
to encourage people to whether it's uh do auto payment so that there won't be a late fee because
it will automatically be taken out of your um your account so can you give us more of those numbers
instead of just anecdotally well we can I can give you some good examples there's a lot going on you
heard me talk about that 10,000 number because we also get folks just quite frankly that try to take
advantage of it too so we have to a lot of things to sort through staff does a great job but I think
what I could certainly put together is some really good examples of where we have done this no and
there's not a lot of typical days we see some of the same types of requests but I I that's a
great question we can certainly show you what it is that we do would you be able to show repeat
sure customers that keep doing it over and over again or are there customers that do that over and
over again it varies it varies we continue to work with people depending on the circumstances so I I
I know what you're asking for and we can get you that information okay next thing I wanted to talk
about I don't want to spend a lot of time on this but this will look a little bit familiar something
that we talked about before moving into water mandatory water restrictions in August was talking
about our tiered rate structure so I'll focus on The Bold numbers on that residential inside City
so increase we have a tier one which is 110% of average winter consumption winter consumption
average winter consumption is determined from December to March throughout the rest of the year
your usage uh and determines which tiers you pay in a lot of folks obvious viously get into
the warmer months and irrigation pushes them into tiers two and three not quite as much as we
had we're still seeing some of that not quite as much as we had of the last year but so what this
shows now is the fees associated with tiers one two and three this applies the residential
and Commercial customers both I mentioned we have 135,000 residential customers we have
almost 17,000 commercial customers um that use a considerable amount of water these increasing
ing block rates like we have are recognized by the water industry including American Waterworks
Association as an effective and efficient way to promote conservation this is done across the
country in many communities uh I talked about new Jen earlier we engage them in April of this year
to analyze our existing rate tiers and see if it made some sense to try to impact conservation
which I'll show you some other numbers in just a moment the goal was to achieve maximum
conservation while remaining Revenue neutral so you heard me talk earlier about potential Revenue
loss because people are using less water the using less water is great we've got a balance what
that Revenue loss looks like this was set out to try and kind of balance both we see almost 20% of
our annual water consumption is during the hotter months during the summer months and most of that
is from discretionary water use for IR irrigation I don't have anything more to add to this today
there's a next slide I want to look at with you too but if desired we could revisit this uh to
further incentivized water conservation one of the biggest issues we ran into was those
177,000 commercial customers quite a few of those commercial customers necessarily move
into especially tier 2 during the hotter months with dis non-discretionary water use what they
have to have for cooling processes production ction whatever it is that they're doing um we
talked about Spirit I'll just give that as an example again when we were considering this we
looked at their usage numbers and talked to them about where that water goes to it would be an
increased uh cost of $3 million a year to them if we were to consider uh raising these tier 2 and
three fees has nothing to do without sort outside watering so there's other businesses I'm sure
that impacts too trying to figure out how that impact 17,000 commercial customers is going
to be a real challenge are there tiers even for commercial customers these these tiers are
the same if you look over to those far to right columns you'll see the commercial inside City
commercial outside City on this it all applies that's where the challenges if you get I'm certain
there's smaller manufacturers that support the aircraft industry that need cooling water during
the hotter months that probably move into tier two would be impacted by a rate increase that has
nothing to do with outdoor watering so that's our challenge I think if we want to look further into
this we're going to have to investigate that more and maybe look at a different way to do this you
know there can you say that one more time about the water with the manufacturing whatever you
just said so there's uh and the spirit was a good example Spirit during the summer that months they
need cooling water right for their manufacturing processes uh they already pay tier 2 and three
rates it's part of their business model if we were to raise the rates that I'm going to show you
in just a minute that we talked about previously we had considered a possible rate increase it was
going to add $3 million to their annual cost while using non-discretionary water for running their
business has nothing to do with watering outdoor irrigation my other comment was I'm sure there's
smaller uh machine shops around that support the aircraft industry that the same thing would happen
to not on the scale of $3 million but they would see they probably pay tier 2 rates now part of
their business model part of their financing plan anything we would add to it though we don't have a
way to separate that right now so give you a quick idea of some options we could look at this would
be a lot to undertake uh ideally if you could figure out a way to get all commercial businesses
to be on a separate lawn meter right how you go about doing that considerable cost that's another
base rate fee that's 177,000 more meters not they probably not all of them are irrigating but that's
a bunch more meters that we've got to maintain that's more counts we've got to track something
we could look at maybe commercial customers could go to more of a uniform rate uh that would be
more focused on tier one base rate because most of their water is focused on what they do as
a business and even if they water outside it's not going to add a lot to it I think those are the
types of things we could look into further but we would need some time to do that I don't think this
is something that we can consider now but I wanted to bring this up again this is the numbers we
looked at previously this is not a recommendation today this is what we talked about prior to the
mandatory water restrictions and so with our goal if you look at that right column uh basically
tier two and three rates more than doubled um but this is what's needed to incentivize continuing
to incentivize conservation New Gen advice that other communities have done the same thing because
most of this water use on the residential side is discretionary water use outdoor if you look at
the revenues we tried to remain Revenue neutral considering our numbers that was pretty close and
that saved an estimated 1.4 billion gallons a year I can't I tried to look and see it's really hard
to tell how that compares to what happened with water restrictions so far I'm sure our mandatory
water restrictions to one day week saved more water than that did for what it's worth so that's
all part of that puzzle we would have to examine I just wanted to show you this again I don't have
a recommendation today but I think it's something that we could look at going forward especially as
we continue to navigate the drought and give you an idea of what options could be um you could have
a requirement that all commercial and Industrial businesses have irrigation meters and then we
could apply these tiered rates new tiered rates to their irrigation uses which would put them on
the same footing is residential that that's just one I mean there's going to be a lot of options
that we're going to ask the consultant to take a look at okay goad go ahead I'm interested in more
about the conservation tier grades as well if we want encourage conservation and we're trying
to address the water water rates I think that probably makes the most comprehensiv I know that
there might be a lot more going into that you know when we talk about spe and particular they use a
lot of gray water do we delineate between that in terms of pricing right we do there's a different
rate for the ReUse correct so there is a different so their reuse is already probably a lower rate
than it it's already it's at a separate rate yes it's it's a different rate so I'd be interested
in exploring this more because I think it it solves two issues and not just one facing the
community and a long-term issue too I think it probably makes sense for us to move forward with
further investigation with our consultant to see uh you know right now yesterday it rained for
the first time in 27 days right so uh looking at the forecast of a dry winter it's not likely
that we're going to be in much different place in the rat now come next spring um let's hope that
we are but either way we really need to start looking forward to the future even if we come out
of this drought at some point in time like we did in 2013 we need to do everything we can to protect
ourselves going forward which I know you know so I think this is prudent that we move forward with
this evaluation it's not going to be something that we'll have a part as part of a recommendation
in December but I I would like to move forward and look at this more and what our options might be um
could we look at possibly breaking it up into for commercial only for five tiers I I think we can
uh and in discussions I had with new Jen in April they've got a really good handle on this and they
have a really good idea of what's worked in other communities and what will be impactful so we'll
rely on their expertise but sure we can I think we can look at just about anything okay taking
that into consideration you just mentioned there's 17,000 commercial customers and if adding 177,000
meters irrigation meters um what would the cost be on uh staff time I think those are also things to
take into consideration We'll add that too and you know not all of them are going to have it there's
a lot of businesses in this community that don't irrigate uh but those who want to if you looked at
that scenario would be required to do that we will absolutely include that is part of the analysis
because there does again every single one of those meters that is added we own and maintain
so it adds to our burd also which has to be part of that rate structure to recover those costs
okay uh this is the last regular slide I have I'm going to mention this real quick and then go
to the other few that way I can be done with this because I know you've got a whole another item to
go so our next steps is to refine recommendations for 2025 based on the feedback we've gotten today
it's been great feedback there's some additional information we want to provide and then sometime
in December we'll be requesting approval for the 2025 rate fee adjustments um I wanted to show
you this one in particular this again is the combined all-in debt coverage the red line being
the minimum required to 120% black line being uh based on our recommendation of 6.14% rate increase
green is if we stay on track with the uh projected or suggested rate increases from 2019 so you
can see we dip well below that red line for a considerable number of years I don't want to
spend a lot of time on this if you want to look at this later uh this is what I talked about for CIP
changes to stabilize rate adjustments you can see on the right column where we delayed projects we
reduced projects we respread funding to different years doing everything that we can to help the
cause here this is just a second one of the same thing that second line down is that line I
mentioned is almost $100 million to run a parallel pipeline from cheni when you asked about elero
utilities optimization uh this was the $7 million we talked about I won't spend a lot of time here
some of the savings came from large water mean water water meter Replacements over the time as
water meters start to fail they're not accurate readings so we're losing a lot of water revenue
from from inaccurate readings renewable renewable energy program LED replacements uh things that
we were doing with our sewer treatment PL to take some loading off of that working with the
Southwest power pool and then we've got modeled savings which I talked about we'll do with the new
plant on preventative maintenance over corrective this gets to your question council member H Heisel
that I'm glad Joanie was here to correct me uh this shows what the rate impacts would be across
the classes so if you look at 2025 in particular top left water um just water sewer combined
to 6.14 at the bottom but a residential Comm customers is different commercial is actually more
this is all part of our cost of service analysis over years for Equity to balance the equity based
on what it cost to get water to each of the types to maintain the facilities and so that came to
me after you asked that question of why these are not the same but this gives you an idea of
what these looks like this does show a projection for 10 years I mentioned before and I'll mention
one more time we want to do everything we can to keep this level to keep this predictable to limit
spikes but we really need this conversation every year especially with the economic climate we're in
to make sure that we're still on the right track so that's the last thing I had thank you for
bearing with me and I I'm happy if you got any more questions is the the residential or the sewer
rates higher than the commercial because of usage um that's a good question Janie on the sewer just in balancing the cost recovery and and
so every time we do this cost of service analysis every five years these can change uh but looking
at our overall cost to operate and maintain the system some years this will be different than
others as far as that balance yeah it looks like they're all above the commercial up until council
member but not by a lot if you remember the last uh cost of ser service study it indicated that
we were undercharging commercial and water and overcharging residential and that's why you see
the spread the way that you do they found that we were pretty close with residential commercial
shading commercial residential a little more favorably under the old plan and so this is meant
to try to equalize that but the numbers are still very close on the sewer side it's water where we
had the biggest differential yeah yeah still you know I'm going to speak up for the residents you
know how I am um the the cheny East Dam repair um from two slides ago is that's different than
what we that's different than what we're working okay so the east of the main dam is is basically
just an norn Dam and we did another analysis and determine we could put that off for now okay um
are we still are we doing anything to reach out to especially uh commercial businesses right now
about um altering some of their watering habits come spring because we all know we've all gotten
the emails from people you know this business had their their you know watering three times a week
or in the middle of rain or anything like that so are we reaching out and kind of relaying like this
is the time to change your your meters your timers to make sure that you're within our drought plan
we are we're working with the com teams comm's team on that you know our concern is as we go
through the fall and winter months here with better temperatures right and the water demands
are down already that as we start to come around the spring folks kind of might forget where we
were at so so we're doing several things I would tell you on November 8th after the agenda review
I'm going to be talking to the council uh about updating on where we're at on drought response
plan and some of those issues that we're doing we're trying to keep the out there as much as
we can I'll tell you one thing we're doing is meeting with Wabba and the development community
in November to start talking about development and building standards going forward in water use
that doesn't necessarily apply to commercial well I'll give you a quick example uh we one of
the best things that we could do is go away from building new developments that's all fesad
right it's going to be a hard sell it's a quality of life issue people like that but rescue yards
take more more water than just about anything um and no matter where you're at but we're going
to start having those discussions so we can get input from the industry get input from the
public but but I think you hit on a tremendous point and our goal um comms is working to
have some billboard messaging through the winter to talk about the fact that we're still in
a drought continue to conserve don't come around to February and March and Reed your yard and and
plant a lot of stuff that's going to need water we've got to keep that message going forward
just as we have to this point but Gary you also where you have received complaints and we have
a specific address we are investigating those we have issued warnings we go back and look at
their accounts and their water use um to determine whether there's validity to the complaint as
well yes thank you we we've really stepped that enforcement up especially on Commercial
businesses when you get multiple locations uh we have met specifically with them staff has
talked to them about the need we've had them provide proof that they've changed their timers
and done those things so we're going to continue to find all those ways that we can to make
improvements I appreciate that um and and in the discussion that you'd have with wava I've
heard a lot of people talking about setting developments and houses up that that are new
builds for uh using recycled water as well so two cents on that one same part of that discussion
thank you yes the last last thing I have um do we have any alternate sources for um the fund to
help out people with their water bills is it or is it just the the donations only essentially
it's the I and sorry if I went over that too quick we we utilize 0 one% of the annual rates
which for 2025 is around $200,000 that's where we start with because the donations to the fund
even though they've doubled we're only about 9,000 so far this year so the core of that comes
from the commitment from the rates okay yeah yeah I didn't know if there were any additional
services or additional pots of Revenue to help so far like I said for what it's worth uh in 2024
we're projecting a usage of $55,000 So based on what we've seen the last couple of years I think
we're in a pretty good place balancing what the the requests and the needs are okay appreciate it
how much is in that fund right now um I can get you that I don't know that I know exactly what
it's in right now we had 192,000 for 20124 and we're projecting using 55,000 so my guess is by
year end will'll be 140,000 left something like that just keeps accumulating here after
you you don't use up all these funds it will continue it does not necessarily continue
accumulating next year we'll start again with that point .01% it's all factored in for
next year all in of what needs to be done how much was utilized last year uh I don't
know if I have that number from last year but I can get you that number so far I mean I
don't we've had this discussion in the past so far we just haven't seen that many requests
we're continuing to do everything we can to get word out there on how this works uh and who
qualifies but so far we haven't even needed the of 1% to cover what the requests have been is
it something we can include in the water bill we have okay we have and that's where uh folks
are notified that they can also contribute to the fund thank you I know there's a lot of
information but I really appreciate your time all right thanks for hanging in there and for this
opportunity uh Lindsay Baka director of Arts and Cultural services with the city manager's office
um this is a an overview at the request of Council of a 10e kind of um checkup on on our public
art program and since we started the percent bar ordinance a few years ago kind of where were
we before where are we now um one thing I do want to point out just right away is that we've been
in the public our industry uh really since the beginning our collection uh spans 132 years uh
dating back to 1892 with the gargoyle series on the original City Hall that's now the the witto
CED County Historical Museum um I think this just is really Testament to the city's uh commitment
to our cultural legacy and our the history and our community and something that uh throughout
the last 132 years we've uh continued to grow the collection in unique and different ways and
thinking about the the city of witch's Mission and how it connects with public art I thought
it would be a great kind of preface to showcase where public art falls into the city's Mission
overall um our mission is to keep witto safe grow our economy build Dependable infrastructure
and provide conditions for living well and public art hits all of these points in unique and
different ways um I do want to just highlight uh number three because I think that this is
an area that maybe not everyone thinks about when they think about public art but it's really
a great uh Source or for an alternative solution to project challenges so I want to highlight
the two uh images we see here I think we're probably most familiar with the the the troll our
beloved troll uh along the river uh that project was a really unique opportunity for the community
there was a former storm water um retention Basin as I understand it that was no longer operable
uh instead of a huge environmentally impactful project that could have been very expensive uh
the project designer in the city at the time decided this could be an opportunity for art so
a really affordable Solution that's really kind of uh been a fun opportunity for the community
to wrap their head around and it's now a beloved part of our our Rich uh public art tapestry
so um it was a very affordable solution and one that has really transformed the way we view
that space and then the the image on the top is uh artwork that the more I dive into our public
art collection the more I learn about it uh and these wind organs there's a series of them
along the river trail um just north of deleno and this is a really unique opportunity for these
windpipe organs to block or to kind of be a visual barrier between some infrastructure that would
otherwise not be super aesthetically pleasing if you're on the River Trail itself so these wind
organs were an opportunity to keep people from climbing on those infrastructure opportunities
that instead of doing a densing we utilize public art as an Al alternative to both enhance the the
visitor experience as you're on the river Corridor and to provide more safety to that infrastructure
that we want to prevent the public from climbing on moving into our budget goals uh for the next
year we've heard loud and clear that there's some some key areas that Council would like us to
focus on and public art plays right into them when thinking about crime prevention there's a lot
of studies about how public art in particular um has uh an opportunity to prevent crime um it's
kind of goes towards the Broken Window Theory and we have uh pride of place and a sense of belonging
when we have aesthetically elevated spaces they're much less likely to receive property damage um
that's not always the case it's not to say we never see graffiti or damages to public art but
it really uh has has seen a national Trend trend on preventing uh crime uh wherever there is public
art integrated in terms of Economic Development I think this this is where our our beloved Keeper
of the Plains comes into play um it's a great example of every night hundreds of visitors
are coming to our community uh to view this work of public art um and the economic uh that
are are is spurred because of that tourism and just that Civic engagement uh can be seen over
and over again um and improving roads this is an area that maybe we don't always think about
where public art comes into play I've got some examples later on in the presentation but public
art is a really unique opportunity to really um calm traffic in areas where there might be some
confusing Lanes or confusing turns um public art is an opportunity to slow down traffic and help
guide them through through an area we see it now as a National Standard with roundabouts being a
great opportunity for public art to slow traffic and really guide them in different areas when
we think about public art uh it's not always just a sculpture in front of a building not to
say it's not that but it's also a whole bunch of other stuff uh so it can be an integrated
site specific installation um it could include Bridges and roadways and for that I'd really
like to challenge us to think about gateways um and entryways into the community whether
that's along um a major Interstate or off of Main Street we have a great Gateway sculpture um
right right off of Kellogg um environmental and educational we have educational panels throughout
our uh Urban environment especially on our green belts and on our um on the river Trails a lot of
educational p pels even at keeper Plaza we have educational panels that talk about the history
of our community that's part of what we consider uh Art and Design projects um we have memorials
and monuments a Veterans Memorial Park that whole series of memorials is actually part of our public
art collection an unexpected counter encounters uh witchta has so many unexpected encounters within
our public art collection that we should really be uh prideful of and really challenge ourselves to
take a um a scavenger hunt amongst our collection I think the troll is a great example uh you don't
often see pictures of it and that's at the request of of the artists it's not on maps it's supposed
to be an Easter egg that you stumble up and it's got some lore attached to it but we have a whole
bunch of them throughout our pools um the the Gerber bronzes across Douglas there's I challenge
everyone to look up at at one of the stop lights and there's a hawk on top of one of our stop
lights we have these unexpected encounters that really just help braid in our cultural tapestry
into our community and make witch interesting place Lindsay you mentioned educational panels
I had the opportunity to be with council member hoisel at cow toown um where they have three um
educational panels that they would love to see somewhere along deleno along the river it talks
about wit's history and so I was just curious how that gets Incorporated how how does that they
already bought the panel so it's not anything that anyone needs to buy so I'm not exactly
familiar with that project in particular uh but in the cow Town's artifact collection belongs to the
board so it's not city property but if it's about putting educational panels along the river
uh that's something that we can definitely explore later in the presentation I talk about
all the gifts the community receives we have a lot of art that's been gifted to the community
that that could be included within well knowing that there's improvements along the west side
of the river I was just curious how that could come into um fruition yeah it well we're willing
to explore any opportunity as it presents itself um and just lastly I think it's very
intuitive but public art celebrates our Rich cultural diversity and our cultural and
Heritage preservation and then just if it's not clear most public art that we have in our
collection hits multiple ones of these bullet points it's not just this is an educational
component it could also be cultural it could also be environmental it's hard to talk about
public art without looking at some so I've got a lot of pictures ridle throughout our
slides um I think all of these examples are ones that we've had throughout the history
of our collection but maybe elements that aren't always considered public art um but really tell
the story of our community so the clock tower in deleno I think we're all very familiar with it
um that's part of our public art collection uh we have a very beautiful airport um that features
art throughout it including the educational panels um that was part of our art element or art budget
for that project but the Ed Carpenter it's called a loft and I challenge you next time you're in the
airport uh these series of uh of panels that that span the entire entry of the terminal are just
quite stunning as you're going up the escalator look up it's a really stunning piece of our our of
our collection that anyone who's coming in or out of our community has the opportunity to enjoy uh
on on the top right you see a bus stop uh that's artwork by El nick bachas uh and that's kind
of integrated design uh the art is part of the overall bus stop itself when we think about how we
mainten how we maintain and service the collection it's really a collaborative approach from across
many departments uh the Limestone walls along the museums on the river complex that's actually part
of our public art collection those are are uh site specific works of art throughout uh that museums
on the river and I again I'm going to make a lot of challenges today because I really think the
community uh should celebrate this collection that we have but along the those Museum signs uh
there's the elements of the river woven between it so part of those kind of what could be seen
as cracks or really the river that's uh going through those Limestone walls and then one of
my personal favorites in the collection is the Lindberg panel in the Kansas Aviation Museum that
dates to 1935 by LW clap again challenge you next time you're at the museum look up at the facade
of the building it's a really stunning gorgeous piece of our collection moving right along into
our Arts and Cultural strategic plan that was passed earlier this year it's all woven together
and and in in partnership with the city's overall mission but I do want to just point out uh part
of our surveying process and the planning process uh was we asked the community where should the
city be playing in the Arts and Cultural sector and public art was the number one uh respondent
of the survey of uh with the most people saying that we should be in the public art industry
the other top uh top four are listed there as well now looking at the design Council um
just kind of a general overview our records indicate that we've had some sort of public
art Advisory Board uh of some sort it's changed names maybe a couple times but uh in Earnest since
1989 we've had some sort of uh governing body over over our public art and aesthetic design uh as
it stands today our design council is a 11 member appointed board um that's appointed by the mayor
uh and it has a series of professions that are required so we have to have two architects two
Landscape Architects two Engineers two artists one graphic artist and two atlarge seats um
and I do just want to shout out that we are currently looking for a landscape architect so
if anyone's watching or uh knows of a landscape architect that would be interested in serving on
this uh commission we currently have a vacancy in that area um those do follow our general
boards and commissions guidelines um and they ultimately make recommendations to city council
we meet once a month um every first Monday of the month at 10 A.M uh these are volunteer
positions they're robust meetings because we really uh look at a lot of different areas of
of the city CIP projects that are coming up the purpose of the design Council by the ordinance is
to make recommendations to city council of the or incorporation of Art and aesthetic design into
public projects uh to make recommendations to develop and Define design criteria for public
improvements uh to make recommendations for the appropriateness of inclusion of public Art
and Design into a public into a project and to serve as an advisory capacity uh to the city
and to City staff and really act as a liaison Bridging the Gap between public private entities
and artists and arts groups we have a lot of uh interested parties in the private sector
who are curious like how do I put a mural in my building or I'm interested in having some sort
of art incorporated into my my new business and we advise on that as well and we steer them into
the design Council when it's appropriate however we don't necessarily have um overview of that
but we provide consulting services along those elements since you just mentioned the murals would
you be able to um also share how community members can see city of witcha public art murals versus uh
community members and business owners who decide to invest and put art sure that's a great question
I've got a slide here coming up about our public art art public art archive.org which is where
the city's public art collection is listed in full just had a meeting last week with someone
from the uh public who's really interested in now that we've got the city's collection the old
Rich's collection is also listed there's all this other art how do we get that listed as well so
there's kind of a a crowdsourcing campaign that we're hoping to entertain as cap capacity permits
uh coming up but as it stands anyone can submit um known artwork into the public art archive um that
we can hopefully build that map out even further but public art archive.org is where you can
see the city's collection in full including our murals so the design Council does oversee uh
the public art itself but they're really over overseeing all the different design elements
that go into a different uh Capital project so this slide is just to Showcase some of the
elements that they look at um it can include flooring um the left image here is the the new
carpeting that's going into the Westlink Library development uh as along with like the different
color swatches and uh types of wall coverings and floor coverings uh on the right so they're really
looking at the overview of the project and all the different Design Elements it's not just public
art that they're looking at overseeing and I do want to just illustrate that every project has
some sort of wall covering some s sort of Floor Covering so they all go through the design council
at some point regardless of if they have public art or not they're all hitting it to make sure
that we have continuity and design so then the percent for our ordinance uh which is a really
exciting thing that the city should be really proud of uh we adopted it in Earnest in December
of 2019 uh to establish formally establish the public art program by ordinance um to really
uh set aside the funding program into the CIP I want to reiterate that we've been doing this for
many many decades the ordinance just changed how how we do it so it just sets the funding
aside versus it being absorbed into the project budget uh but we've been doing this for
many many decades uh the ordinance provides um the guidance for the funding the selection CR uh
creation and the maintenance it sets aside could set aside maintenance funding for public art of
which our design Council has approved these last few years and establishes the responsibilities
relating to the administration of the public art program uh and I think that last part is
really exciting and in my three years that I've with the city we've been able to hire public
art manager so now we have a dedicated staff member who's helping make sense of this
all so shout out to Jana uh who's in the room who's really just helped make sense of our
132 year old collection because we haven't had that dedicated person really tracking what we
have where it is how did we get it uh so this assignment for today was really exciting to
look at the tenure overview I have a question that might be applicable in this part um so
what art do we have um that is uh in store now so I know we have the Lotus sleeves I know we
have one of the Jone arcs I know what are some of the other pieces that we have um we have a statue
by Jean salaro I might have butchered his name um I'm trying to think of any others we have a
couple that are within offices that are more 2D like paintings that haven't had a site
identified but they're not necessarily in storage but aren't on public gaze my
guesstimate would be less than 10 people pieces but I'd be happy to kind of put together
a listing and provide it to council okay thank you but it's not as many as I think the public
might think that we have a large storage room or large collection database that's offline we
do have several pieces that are but we're uh couple weeks ago I think what prompted
this presentation was the presentation for public art maintenance where we're
trying to get those works out of out of storage and then maybe one other moment to to talk
about here that we haven't done a full analysis of comp cities or Pier CI I uh but in our brief
analysis we are a little bit behind the game Tulsa's uh percent for art program is dates to
the late 60s um De Moine I think is the early 90s even though we've been in this work our ordinance
is uh pretty far behind of where most of our Pure cities are but that's part of today's assignment
that we didn't quite get fully to but we're still working on the analysis to see what what the
National Standard is um across the board are are most of them 2% or is that that's a a an a tough
question to answer because our 2% is different the the total or the impact might be a different
Mark U but I would say an average there between 1 and 3% as a as a national average average in
our larger cities you might see something a little bit different um their funding mechanisms
can can vary greatly I mean and and where where it's located within a city can vary in the city
of Austin it's part of their Economic Development Department um in other communities they put
it to the nonprofit sector where they have the dedicated funding um I believe that's how De
Moine works and then they have a foundation that's Distributing or managing those projects um so it
really can vary greatly interesting that it's in uh the economic development department in some
places yeah well I mean when it's part of new new builds or Capital overlays it it makes sense to a
certain degree especially for a city like Austin that's doing these massive development projects
um I think where it's poised within our city is very exciting too because we work across all the
different departments between Park Rec Library Public Works where the projects are happening
and who the project managers are so while it's healthy to look at our peer cities we still
want our program to work for witcha appreciate it and looking at the funding itself um the
ordinance uh states that an amount budgeted for Capital Improvement projects financed by uh
go at large funding uh LSD or transient guest taxes projects that are identified as iconic
projects are defined find uh in the ordinance can be independ can independently have an amount
not to exceed 2% of the Project's budget added to the project cost or art aesthetic improvements
so that one's a little clunky um in my tenure since the ordinance was approved in December
of 2019 we have not identified a project as such so although that's within the ordinance we
haven't put it to work just yet um I think we've had a couple projects come up that maybe could
have been identified as such but weren't uh for whatever the reason but we have not utilized
that part of the ordinance just yet which ones were those um I I think like Chester Lewis is
a good example it predates the ordinance when it when the project started so it wouldn't have
been identified at the time uh the project was initiated uh but I think we can I I would say
it's an iconic project of of public art for the community and then perent for art funds
are to be used for selection installation Administration and maintenance of artworks
moving forward into the funding allocation itself uh Department directors and staff present
annually to the design Council what uh New Capital improve Improvement projects are coming up or
if the CIP has changed year to year uh we see some projects go on the agenda or on on on the
project list and for whatever the reason they might be pushed back they might be moved up uh
so we work with the design Council to to Showcase where we think projects are going to fall uh in
the lineup and what might be uh a good project for uh art funding consideration and and as such
what the appropriate level for funding would be uh the design Council then designates the art
budget for the capital Improvement projects again they have 2% of the overall CIP to use
um and the criteria that they look like is really twofold the community impact and public
interest and the significance of the location those aren't the only determining factors
but there those are two main criteria that we look at um when determining if um a project
would be eligible or should be considered for funding okay okay um how public art is
commissioned uh we have done some changes in this area over the last couple years uh really
we've taken the the selection of artists outside of the project Prime team if you will uh and we've
done a separate call for artists to make sure that there's Equitable access to the opportunities
uh that's something that was very clear when I started with the community that they knew we were
spending money on Art but didn't have access to the opportunities or weren't sure how to get
involved so we've now pulled that part of the project out um and kind of separated so uh we now
do a open calls anytime we are going to hire an artist or art consultant for a project you see a
graphic here for uh a call that we currently have open for the Aransas River uh Corridor project um
so so we do that separately the the Project prime or the lead architect or construction manager is
part of that selection process because ultimately the artist or art consultant will be a sub
under them but we've pulled that out just to make sure that there's Equitable opportunity uh to
participate um and we issue them through cafe or callfor entry.org this is the National Standard
uh for for posting calls to Art uh since we've done this we've seen a huge response from National
artists interested in participating which has been really exciting and we've also seen our local
artists Elevate uh to to further understand how they can be uh successful in bidding on projects
and it's also helped our local artists understand and learn about opportunities outside of the
community so we're furthering uh the development of the professionalism of our local artists uh
we have a selection committee for each project that's comprised of City staff the project design
team itself different stakeholders and community members really each project has its own unique
identity so the selection committee for the art um can really vary project to project we've also
started including local artists on that selection committee uh who are interested in participating
but maybe haven't successfully gone through the project yet or gone through a call uh so that
they learn uh how how our process works I like to use example of uh the first time I wrote
a grant I didn't get it and then I served on a grant Review Committee and that's like oh
that's how you write a grant uh that's kind of our philosophy here is to make sure that local
artists kind of understand how it works and once they see everyone's submissions on a national
level that they're elevating their experience as well in terms of project management uh art
consultants and artists work collaboratively with the prime consultant the design team in
the city uh through the the concept design itself through design development fabrication and
installation we like to say that the art is baked into a project it's not just art that's put on the
project project at at the end um sometimes we're really successful in this sometimes uh we're not
um but but we are working to make sure that the art is really baked into the project from from
day one um Art and Design projects are brought to the design Council for approval uh prior to
the RFQ being issued so when the project knows it's going to have art they bring that call to
the design Council to say here's where we think we're going to have the art we're looking for a
sculpture we're looking for this type of artist we're looking for this type of media to be used
um where we think this is a local call or this is an international call the design Council then
approves the RFQ process itself and the issuance of that RFQ and then the art comes back at least
twice at 30% design and 90% design often it comes back for a final final design uh so that the
design council is part of it every step of way in the development of the project and I might just
point out at this point that I not every project has an art consultant actually very few do um it's
really projects that have multiple artists working on them or or more sizable budgets or a project
that might have more uh cultural sensitivity or site specificness that requires uh just some
additional um additional support okay now here's where um I have some updates um on on this slide
uh from when this presentation was submitted uh so I handed out earlier at the beginning of this
meeting and hopefully council member tle if you're still listening you receive this via email um the
the list of Public Funding by District District or public art but spending by District over the
last 10 years this was a really um interesting assignment to trying to figure out where where
things fell into the timeline of things uh but just for those watching or those listening uh the
updated uh numbers are for district one uh about $1.8 million mean spent across um six or seven
projects over the last 10 years uh in in District Two only one project at 225 and also at District
three 225 across one project um then we have some changes in the following on so in in District 4
uh we estimate about $1.8 million across three projects that includes the airport Riverfront
stadium and the Aquas Aquatics master plan part of it so very sizable projects make making up that
$1.8 million um in District Five we we estimate $280,000 across two projects um including a
pool a harvest pool and pro Wetlands um and in in Council district 6 we have a whole bunch of
projects that that total about $3 million based on our estimates of course as soon as I submitted
this even this morning we thought of a couple other projects um that that we weren't quite sure
where to put so nafer park and Jackie Robinson Plaza um by all means have uh Creative Design
Elements within them but they weren't necessarily part of our present our program so we weren't
quite sure where to put them uh but they are listed at the bottom as well as a a larger list um
on your handout of projects are currently in the works or are anticipated to start um coming soon
this slide right here shows all districts at 1.2 million for pools was there anything additional
to this um so so that's where uh the handout that you have breaks the pools down per District we
had five pools that were part of that in uh I believe four districts District Six has two pools
uh so we we really distributed those between the pools uh between the districts evenly um and
that's where it's kind of tricky because many districts um you all differ so much and thinking
of uh which district which district has a library versus which district has multiple pools we know
there's users of all districts users of all these facilities coming from different districts uh
but the art spending is really uh related to what project is happening in the district so
the the project itself drives uh the placement of art the art isn't selected by District
if that makes sense little It's tricky to explain so moving on I do want to just reiterate
that we have public art throughout the community and this is uh mayor you you beat me to the
punon publicart archive.org we have over 300 Works um accessioned into our public art
collection um about 205 I believe are listed on public art archive.org as we're trying to
update that but you can search it by map you can search it by type of artist uh by media by
the title of work uh and more but we encourage you to check out publicart archive.org
can I ask a quick question of course on the one the picture with the highway yes
windal are those weeds covering up the art it's in the eye of the beholder I might
offer it looks like weeds it could be part of the landscape I would say the art component
that uh uh we were responsible for would be the relief within in the wall itself someone will
be offended that's native plant planting that is intended to be there as part of the project
really yes okay you can see the flowering on the left hand side of the a lot of weeds have
flowers too those are a little better defined okay okay thank you um moving right never get
that landscape architect on the design Council now um I do have a breakdown uh of of projects
by district and by budget uh that we can fly through I'm happy to answer questions as I'm
able to about specific ones um for for this project in particular this was a new airport
terminal I do have an update it's TBD listed on the slide but uh our art budget for it
was $875,000 and that's that Ed Carpenter piece and the informational panels that you see uh
throughout the the main uh entrance to the to the facility we also did a project across
Redbud we had three pause points is what we call them of installations that
celebrate op our our Rich cultural identity um and those three pause points
were $222,000 and were acquisition in 2015 I do have a correction here this
is in district one this is the the Commerce Rail Yard parking there's
a stage and some some wheat stock elements or light lighting elements
that you see throughout that's from 2017 we have a series of murals um under the the the train tracks um at first
and second Street those are from 2018 this is another uh project budget that it
took us a minute to to find the number on uh but this is the the sculptures that are along the
river near the river Vista Apartment Complex um and we spent $442,000 on on the art installation
on the aesthetic design um of that area uh this is at the advanced learning library I'm sorry if I go back uh this project
was $400,000 the library project was $442,000 uh and we have several works of our integrated
throughout um the advanced learning library uh we have art uh in the underpass on The Pedestrian
railings um on Douglas under the under the the train tracks um we call these hobo railing
and it was designed by by Jeff Bess of LK architecture this project is from 2019
and some integrated design elements and pause points uh there's five
AR installations from I35 to Hillside uh proc Wetlands has seen a couple
different phases of Art and has an upcoming uh phase as well in 2019 we spent just shy
of $200,000 with RDG art studio uh for this integrated design the Lotus blind itself
and I this is where we have some interesting educational panels and the blind itself is
part of our art collection and this project did receive an excellence and design
award for award um from ASLA Central States it was tough to pick pictures from from the
riverfront Stadium but uh the the stadium is just covered in art uh we we completed this project
in 21 um and our project budget was $680,000 um we have so many uh murals throughout
the facility I I picked one that's one of my favorites but in all of the restrooms
actually in the complex uh there's really fun murals that would be wonderful selfie spots
um but then there's also some integrated design elements the picture on the right is actually
a bike rack um that a scene at different angles makes up the witch toop flag we also have um
I would say Specialty Lighting elements um and and and different integrated design elements
throughout this whole complex Harry Street Bridge is a recent acquisition in 2021 we spent
$225,000 on this project the aquatics master plan that's where we had it previously listed
in all districts both and were able to break it down uh District by District um across
five pools we spent about $1.2 million for some really significant works of art um here
you have Orchard pool that actually the the trees themselves that make up the shading elements
over uh over the seating area are part of our art collection this is East Kellogg uh we
spent about $225,000 on the design fees of this project this is an interesting
project to kind of figure out where the art is or isn't or kind of what our scope of
surfaces was um this is maybe a good example where we would have been doing some sort of
um construction or concrete form liners anyway uh but we had an artist involved to make that
more of an exciting uh welcome Gateway into the community Evergreen community center
and library in 2022 we installed several wonderful murals uh by uh Heather Bayer
buers Armando and Carlos oh sorry just a quick comment that was District or
District Six not my apologies thank in district one we have Chester Lewis
Park um I would like to point out that this budget includes private funding
um that helps support the art in this project one of our more recent acquisitions uh is
on the Amed Bridge the light columns by artist Dan Gan and then one of our projects that's currently
in the work and getting a lot of attention is at the witw Waterworks I do want to point out that
we still have one sculpture that's anticipating installation actually found out yesterday
that it might be January of 2025 before it gets installed we had a have a little bit
of a shipping delay um but we we do have one more piece coming at the witw Waterworks
have you had any good comments on that at all absolutely we have have you yeah the artist sure
haven't well I think CA Chen's uh work that's uh pictured here uh she came out to the community
several times met with school students uh met with University students about the integrated
design of approach and their design elements are incorporated into the benches themselves and
that process of community development through the through ART was such a meaningful opportunity
for those who were involved so those who are involved absolutely loved it um the bike path
is relatively new um and still in progress so I think once the bike path is finished um and
that whole project is finished um I think the community might might change their minds a little
bit about about that project it's only got one way to go so Lindsay um the the final piece that's
still missing can you talk about that piece what is that piece um I can get back to you on it
with with specifics but it's quite a large uh sculptural element that's going to go um along
the bike path uh in the tree line right in front of the building so here you can kind of see the
water droplet in the in the very far distance um it'll be to the right of that along the B path
as well but it's um an environmental sculpture that's inspired by by the Ecology of water
uh and happy to provide some more information about it I will say it's the largest and most
significant piece that's part of this project itself moving on into gifts we've
received quite a few gifts over the last 10 years um including Operation
Freedom Memorial at Veterans Memorial Park this is one of my favorite pieces
in our collection uh this black bear bosen that's on display at the mid America
all Indian museum um the picture really doesn't do it justice because it's
36 feet long and 8 and 1 half ft tall we also received some murals through the
horizont community project that was funded by the Knight found Knight Foundation
Humanities Kansas and the Kansas Arts commission some additional
murals through that same project there's another mural on um on the
Evergreen Library building that was gifted to the community through through a similar
project through the horizont communities mural project the Tyrannosaurus Rex in front of the
uh Museum of World Treasures was a gift uh to the city and it proudly sits in front of that
museum that's part of our collection we have a series of 2D works that were have also been
gifted to us over the years this is one of uh one of Anthony doer a prominent local artists
is gift to the community another painting this one is on display at the advanced learning
library in one of the boardrooms um this was a gift of the Arts Council as part
of a community um drawing project as I understand it the mural in the Maya Angelou
library was a gift to the the community in 2021 very recently uh we had a gift of the
artist John walner of True Colors this is a a mobile that's on display in the advanced
learning library we recently had a a sculpture by Roland car of car art glass and Kei donate
a sculpture to the city that's on display in Oldtown and then these are just some examples
of additional projects that might come into into fruition so uh the work on the left on the
left big red by David stz is uh on view in front of the advanced learning library this is a piece
that was uh in storage as I understand it for a long time it was maybe a gift to the community
or how we acquired it is uh still a little bit unknown to me personally uh but it had been been
in restoration and conservation for many years and we were really excited to to put this out on
display last year in front of the library uh it's from 1985 but hasn't the the community hasn't view
it viewed it in in many years so we're excited to bring this out and then the the mural on the right
is a a restroom uh facility in one of our parks in Harrison Park on the Southeast side this is part
of a a collection of murals that was gifted To Us by the artist um and and his cohort um these
were these popped up this past summer we have a lot of murals throughout our Parks program
uh we recently unveiled a mural at the Great Plains Nature Center over the weekend that was
donated to the community or part of a larger granting process uh we had a new series
of murals go up at Lynette wood Woodard uh Recreation Center we have artistic benches
throughout our Parks we've got art everywhere that doesn't necessarily mean it's accession into
our public art collection uh but we will Champion it anywhere we can um and we're so thankful for
the community members the individual artists and the the projects have uh come to fruition
they uh gifted these opportunities to the community this is a listing of projects in
development it's by no means an exhausted list um I think the handout that you have
that has the ongoing project list that's perhaps a little bit more accurate
but these are all projects that are in some uh sort of uh development phase
at the moment or we're wrapping them up still and then as part of today's assignment we
wanted to talk about destination Parks um these are the seven parks that we've identifed ified
as destination parks and um uh Reggie was not able to be here today but he provided me with
some language that destination Park is a large inclusive park that's designated or designed to
attract people from other communities so it's not just for local residents though though
it definitely is for them but it is also to attract uh people from other communities they're
usually multi-generational and feature a variety of Play Elements and equipment in the area uh
destination parks are also are often customized designs to highlight locations of history or
culture and incorporate natural elements they can also be a major attraction for local residents
and visitors um of note I just want to point out the some developments that we've had at OJ Watson
uh we do have a public art project coming up at that at that site but I think a great example of
a recent uh investment that we've done there as a season venue uh that opened up uh in in recent
years would Riverside not count as a destination Park not necessarily I think it it
could be uh this was a list provided by Reggie you know if the city has any of um goino
SOS wooden sculptures like the Rapunzel or the mermaid or any of that stuff that used to be
I think some of it got damaged but yeah um do we still have any of that or is that City
the city's we have one that's in storage um and then I do know that Botanica has several
within their Children's Garden that that by him so those were funded by Botanica Inc
but in a city facility they become city property and with that that's all I have for
you I'm happy to answer any other questions that you might have I'm very appreciative
of this presentation and really appreciate it seeing all the different uh public art
pieces in all the different areas of our community um my question really is more about
maintenance so I really like that we keep adding but how are we maintaining and is there a deficit
do we need to put more into maintenance so that's a great question thank you um definitely as
we grow our collection we want to be mindful of Maintenance something that we've instituted
in the last couple years especially now that we do the full RFQ and part of the contract we
have with the artists is that they give us a detailed maintenance plan so that we know
how to care and protect it um I think one of the differences between some of the community
projects I mentioned um the restrooms at at Park facilities one of the reasons they're not in our
public art collection formally is we don't really have capacity to maintain those so those those
we kind of separate out for the works that are are developed in design and acquired through
our percent forart program those we want to definitely maintain in perpetuity or until they no
longer serve the community um with those detailed maintenance plans and as we are still trying
to wrap our heads around the whole collection um currently we have $160,000 a year through the
CIP for art maintenance um this year 2024 is our first year implementing those funds uh if we have
those funds in perpetuity or we have them lined out in the next 10 years at the CIP uh we believe
that's going to um help get us back on track um it's hard to say we would need more money although
I'm sure we would find something to do with it um but but we think that that number is sufficient
to get us out of any sort of backlog that we may have um I've also had community members interested
in providing VES um so how does that work when a Community member wants to provide art um I would
encourage them to reach out to myself or to Janna uran our public art manager really depends on if
they have uh a location in mind if it's part of a park or a memorial that we would might steer
it to the department itself um because we always want to ask them does it serve a purpose in your
community or or at the site uh we've had someone reach out about an airport project wanting to
donate a um a bust of Eisenhower to the airport would that be appropriate how would that work um
so I think it's really Case by case we entertain them um we reach out to the Departments and their
various advisory boards ultimately any public art that's accessioned into the city's collection has
to be approved by the design Council lastly I love seeing all the murals around the community I know
that you highlighted a few of them uh but there's a very exhaustive list of murals all throughout
Witchita is there one place just for the murals um in terms of a listing on public
art archive you can search by type of art so you can select art or mural in
the the criteria that you're looking for and it will show you all the murals that are
actively listed there and it could be private individuals that can put that into the system
yes I would say they're not currently there but the public could Implement them into
the into the software or into the platform Lindsay thank you I I I don't mean to be too
critical on the water treatment PL but I just don't see $1.2 million wor the art there yet and
I maybe I'll be wooed by the final piece and and and maybe that water drop is cool but it's so
close to the building the building light kind of diminishes the the light coming through it um
maybe it could be recited somewhere just an idea not an art expert at all and I do appreciate
a lot of the art around the city I do really like it so uh did thank you for doing a great job
we appreciate thank you fair enough I would say this art uh is for everyone but that doesn't
mean that Everyone likes every single piece of art I think we want to make sure we have
somethinge for everyone in the collection um and hopefully you find a favorite piece somewhere
else in the collection uh we do have the capacity with sculptures that they can be recited as as
needed um we did recite U the work that has not been installed was supposed to go somewhere
else in the facility but then we realized you know the sight lines just don't work that the
community is not going to be able to enjoy it so we've then recited it to its going to be current
location when it is cited so you're not seeing $1.2 million there because it's not there uh so
so we can reassess when it's out there uh what you think about it okay thank you see I know we may
do this in some locations I know we actually do this in some locations as well but in particular
my office I have pieces and collection items from Aviation Museum or the Kansas Aviation Museum and
Ben's going to yell at me saying which Aviation Museum Kansas Aviation Museum and um I think it
would be great if we had opportunities in all of our public buildings to display collection items
that are at our museums that aren't necessarily or that could be permissible to leave the museum I
know there are some pieces that have to stay there for security reasons but I mean even if it's the
Public Works building or something else so we're displaying the artwork from a lot of our Museum
collections maybe that inspires people to go to the museums if it's collection pieces that can
lead Museum yeah I think that that last part is where we get a little bit tricky as long as we
can uh maintain the Safety and Security of th those items that kind of really dictates where it
can go all of our museums have unique collections management policies not all the collections
Belong To The City so it gets kind of tricky of what we can and can't uh distribute and what their
loan policies are and what their advisory boards permit but something definitely we would love to
explore more art for more people everywhere is always a win for me so happy to explore explore
that further good afternoon Lindsay I appreciate the thorough report that you've done here that's
uh quite a bit in here um I do appreciate it and all of the art that we do have around the city
because I know sometimes I think we overestimate our ability for economic development when report
after report after report that comes out talks about things like the Arts and um the parks and
whatnot actually driving and bringing businesses here because they want a higher quality of life
so um I do appreciate all the work that um we've done I my little Southside thing over here um
I would like to see some more on the Southside um pretty STK to see if if if you look at the map
just everything north of Kellogg south of Kellogg I understand downtown's going to be the center
of a lot of it but um we do have some money from uh some Hyatt funds um for murals in the Third
District I just want to put that out there now now just that way um if anybody's watching we would
love to have more murals there and we do have some funding and I'm excited to see as we go along
with uh the plane view project seeing something um similar to what they've done at some of the other
uh neighborhood Resource Centers and community centers making sure that um just the diversity of
the community is celebrated the diversity of the Third District uh hopefully will be celebrated
at the plan View Center as well so aside from that thank thank you for all your work on this
thank you if I may just thank you for prompting the economic uh impact opportunity we know what
the the local nonprofit arts and culture sector uh drives in terms of our economic Prosperity we
don't have really good data on public art itself but I think if we look at National standards uh
public art that may or may not have been popular when it was installed we know our huge drivers
of of Tourism and economic development I think the Bean in Chicago is like a perfect example
of when it went up the community was like what is this um but now it's a must stop whenever you
go there Statue of Liberty our most iconic work of art probably in the the our communal history
uh collection in the US a major driver of of a lot of economic activity so I think we should
be really proud of the collection that we have our Keeper of the planes is drawing hundreds of
of visitors every single night to our community um and we should be really proud of it that
this is something that we uh should celebrate that our collection spans 132 years uh we're not
new to this game uh although we definitely have is for improvement and would love to see more
we've got a really really wonderful collection and we'd love to put some more on the South Side
I want to reiterate that uh the CIP project drives the opportunity for art that's really our only
mechanism to acquire art right now unless there is a CIP project in that area or in that District
that we can put an art project on or if we get a project donated to the community those are
really our only two opportunities right now to acquisition art Lindsay I want to say thank
you for the presentation you and your team uh for putting this together so quickly um this
was wonderful I know it's not everything but 132 years of seeing how we've continued to
invest in beautifying our community um or in the words of council member total public design
um I think this is more evidence that we need to continue doing so and definitely appreciate
it um seeing this the projects that are on the way the projects that council member H Heisel was
talking about in South witch um for me the just is more motivation to keep going and adding more
to it I think the maintenance conversation as I've continued to say is important and I feel
like that should be in the CIP but um I don't see a reason why we should slow down on the new
pieces and new design and every time we have the opportunity for new building or new structure in
the city of wiah um having some form of artistic design to it I think it's key because that's a
that's a piece that will last for decades and you know always use the fire station at 21st
in Hillside people always talk about how that was designed um and the artistic elements there
and for me that's just motivation to make sure that's always a part of what we're doing thank
you I'm just gonna Echo this for the community um we have a lot of individuals in community that
provide also public art um and I am appreciative that people make an investment in helping with
public art as well and so I'm going to encourage encourage people to submit their murals into the
system so that there is a comprehensive list and when people say where are the murals we can point
them to not just the city of witcha murals but murals um that again are public art for everyone
to enjoy um even though we may not be paying for it thank you not not to prolong this I do want
to emphasize that public art is about community building and as we have expanded our collection
especially in the last five years we've provided more and more opportunities for people to
see themselves in the art that we provide and I think that inclusion is really important
I think goes back to what council member said council member H Heisel said for his district
I've talked to one or two of you about this I just came back from Cincinnati talk about Economic
Development impact they have an immersive art um festival for four days in downtown Cincinnati
they they estimate over that 4day period they draw two million people to their downtown and
their low estimate for economic impact in the community is $125 million I've seen numbers
that are as high as over $200 million so big business over a 4-day period so it's there are
opportunities here I think for us to to make a mark not just with our everyday residents
but also for uh visitors and through you know for to our community so with that mayor that's
all we have for the um Workshop thank you very much e e